Similar Projects
Buffumville Lake Electrical Upgrades, Charlton, MA
Design
$250,000 to $500,000 est. value
Charlton, MA

Turkey Hill Elementary School Air Conditioning
Bidding
$25,000 est. value
Lunenburg, MA 01462

Bus Bay Rehabilitation
Bidding
Fitchburg, MA

Pump Station Roof Replacement and Repairs - General Bid
Post-Bid
$240,000 est. value
Fitchburg, MA 01420

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Scheduled and Emergency Structural Repairs and Painting on 6 Bridges at Various Locations
Results
Less than $3,335,820 est. value

Structural Steel Cleaning, Painting and Repairs on 3 Bridges over Interstate 29
Results
Less than $2,289,582 est. value
Boylston, Worcester, MA 01505

Padmount Transformers
Bidding
Shrewsbury, MA

Town Hall HVAC - AC Condenser and Coil Replacements
Post-Bid
Less than $78,000 est. value
Westminster, MA 01473

Little League Field Lighting
Results
Sturbridge, MA

Flooring Services/WPS
Term Contract
Post-Bid
Worcester, MA

Generator Replacements - Pump Stations / DPWP
Results
Less than $575,000 est. value
Worcester, MA 01608

Gym Floor Installation - Greendale Head Start Center/WPS
Post-Bid
Worcester, MA 01608

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Carpeting at Forbush Memorial Library
Post-Bid
Less than $55,000 est. value
Westminster, MA 01473

Last Updated 06/09/2020 09:30 AM
Project Title

2019 Roof and Boiler Replacements - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Worcester, MA 01604   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Electric, Flooring, HVAC, Mechanical, Painting, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,504,663
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required. The project consists of the Roof Replacements on four Schools and one School Boiler Replacement.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Flooring, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents