Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Lift Station No. 42 Replacement
Renovation
Bidding
Saint Petersburg, FL 33716

Construction Services for the Southwest - 5404 118th Street and 6217 Wilson Boulevard - Class III/IV Pump Station Upgrades
New Construction
Bidding
Jacksonville, FL 32244

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Lift Station No. 6 Relocation and Collection System Improvements
Renovation
Post-Bid
Mulberry, FL 33860

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Lift Station CA-14 Rehabilitation Improvements Project
Renovation
Bidding
Callaway, FL

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

DLTWTF Master Plan Improvements Design Build
Results
$19,000,000 est. value
Tampa, FL

Effluent Disposal Project
Construction
Chipley, FL

Rolling Hills Subdivision Gravity Sewer, Lift Station and Forcemain
New Construction, Infrastructure
Bidding
Loxahatchee, FL

PVI Water Tank Removal and Installation
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34237

Last Updated 10/29/2021 05:49 PM
Project Title

Reclaimed Water Ground Storage Tank and Pump Stations

Physical Address View project details and contacts
City, State (County) Haines City, FL 33844   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To construct a new reclaimed water ground storage tank (GST), transfer pumping station, and high service pumping station at the Haines City Wastewater Treatment Plant (located at 851 E. Park Road, Haines City, FL 33844) to provide additional reclaimed water storage and to preserve the quality of the treated reclaimed water for the Haines City public access reuse (PAR) system. A new transfer pumping station will pump water from the chlorine contact chamber gravity discharge into the new 3.0 million gallon (MG) GST. A new high service pumping station will draw from the new GST and discharge into the existing PAR system. In addition, the City intends to construct a new off-site package booster pumping station, adjacent to the Southern Dunes Golf Club (located at 2630 N 10th Street, Haines City, FL 33844). The new booster pumping station will pump from the existing PAR system directly to the golf course high pressure irrigation system, avoiding re-pumping from the golf course storage pond which decreases water quality. A new reclaimed water pipeline will be installed at the Southern Dunes Golf Club and will tie-into the existing high pressure irrigation system at the Golf Club’s existing well house.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents