Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Comprehensive Maintenance Services
Infrastructure
Post-Bid

2021 LMIG Project
Results
Mount Vernon, GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

2.900 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 23 Beginning North of SR 23/SR 38 and Extending North of Jaycee Landing Road
Results
GA 31545

Roadway Improvements For Holmesville Road
Results
Jesup, GA

28.084 Miles of Milling, Inlay, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 27 Beginning South of East Railroad Street and Extending to the Glynn County Line
Infrastructure
Results
GA

2020 CDBG
Infrastructure
Results
Jesup, GA

2022 LMIG Road Resurfacing Contract
Infrastructure
Results
$1,000,000 est. value
Jesup, GA

6.590 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 38 Beginning West of CW Collins ST and Extending West of SR 203
Infrastructure
Results
GA

Last Updated 06/19/2022 10:59 PM
Project Title

Roadway Improvements for Hortense Road Phase 1

Physical Address View project details and contacts
City, State (County) Screven, GA   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of paving approximately two miles of Hortense Road. The work to be done includes the construction of Roadway Improvements for Hortense Road - Phase 1. The proposed work includes grading, installation of soil cement base, triple surface treatment with sand seal and drainage improvements. This project will be Phase I of the roadway improvements only. Phase II and phase III are not part of this contract. The length of the roadway improvements for phase 1 is approximately 6,000 linear feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents