Similar Projects
Roofing Repair and Replacement Services
Term Contract
Bidding
Allen Park, Dearborn, Detroit, Fort Gratiot, MI 48226

Roofing Repair and Replacement Services
Term Contract
Bidding
Allen Park, Dearborn, Detroit, Fort Gratiot, MI 48226

Weather Sealing of Roof at Fire Station 2
Post-Bid
Farmington Hills, MI 48336

Roofing Bid at Hayes, Randolph and Riley Schools
Post-Bid
Livonia, MI 48154

Reserve Forces Support Center Replace Roof Building 30
Results
Lansing, MI 48906

Public Safety Building Roof Repairs and Annual Preventative Maintenance Program
Results
Less than $24,399 est. value
Berkley, MI 48072

General Contractor Services for HVAC and Roof Replacement Project
Alteration
Bidding
Mount Pleasant, MI 48858

Roof Replacement of Picnic Station at Pine-Linden Park
Post-Bid
Dearborn, MI 48124

Residential Roofing Service
Term Contract
Results

Remove and Install A Roof on the Waterford District 4 Offices
Alteration
Bidding
Waterford Township, MI 48328

Skylight Flashing Repairs at DPW Yard
Post-Bid
Dearborn, MI 48120

Washington Street Elementary and Otsego High School Roofs
Results
Otsego, MI 49078

18th District Court Roof Replacement
Alteration
Bidding
Westland, MI 48185

Algonquin Elementary Roofing
Post-Bid
Clay Township, MI 48001

Million Gallon Tank Reroof
Results
Hancock, MI 49930

Reported 02/12/2022 12:00 AM
Project Title

Terminal Roof Replacement

Physical Address View project details and contacts
City, State (County) Flint, MI   (Genesee County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center - 01/17/22
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work includes the following: Removal of existing roof membrane and all accessories including insulations and installation of new single ply roof membrane system including all accessories (flashing, counterflashing, blocking, coping, etc.) Work included selective removal of a section(s) of standing seam metal roofing at gutter areas, roof board, and rigid insulation down to deck, EFIS wall covering, and related trims and flashings as required for new roof system. Installation of a new EPDM Single-Ply Membrane over a new metal gutter and roof insulation at select gutter areas and installation of new Single-Ply mechanically adhered PVC membrane all other areas. Removal and reinstallation of snow guard system as indicated on drawings.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents