Similar Projects
WWTP (Wastewater Treatment Plant) Expansion - City of Clinton
Addition, Infrastructure
Design
$5,000,000 CJ est. value
Clinton, MS 39056

2021 CDBG Wastewater Improvements
Renovation
Design
$6,000,000 CJ est. value
Morton, MS 39117

City of Greenville WWTP Noncompliance Groundwater Treatment Control Plan (Clarifiers 1 - 4 Gcp Project)
Renovation
Bidding
$200,000 CJ est. value
Greenville, MS 38701

Water System Improvements
Infrastructure
Bidding
$4,000,000 CJ est. value
Summit, MS 39666

Utility Extension & Treatment Plant Expansion - HLRA - 11
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Moselle, MS

Wastewater Treatment Improvements
Renovation
Post-Bid
$200,000 CJ est. value
Tutwiler, MS 38963

Wastewater Treatment Facilities and Collection System Improvements
Renovation
Results
Marietta, MS

Wastewater Facilities Improvements
Renovation
Results
Marks, MS

CDBG Wastewater Improvements
Renovation
Bidding
$375,000 CJ est. value
Osyka, MS 39657

2020 CDBG - Sewage Treatment Plant Improvements Rebid
Renovation, Infrastructure
Post-Bid
$325,000 CJ est. value
Crowder, MS 38646

2021 Wastewater Treatment Plant Improvements, Phase 2
Renovation
Results
Cleveland, MS

CDBG 2021, Wastewater System Improvements
Renovation
Post-Bid
$3,000,000 CJ est. value
Durant, MS 39063

Wastewater Treatment Improvements
New Construction
Results
French Camp, MS

Harrison County Utility Authority
Term Contract
Post-Bid
Gulfport, MS 39501

Wildwood Wastewater Treatment Lagoon Levee Repair Project
Renovation
Results
$238,615 est. value
MS

Last Updated 05/04/2023 08:33 AM
Project Title

Wastewater Facility Improvement Project Phase 4B

Physical Address View project details and contacts
City, State (County) Moss Point, MS 39563   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $875,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner is NOT responsible for bids which are mailed to the wrong address or which arrive in the mail after the designated bid opening time. Bids may be delivered in person to the Owner's office prior to the bid opening at the location listed above. The project will be awarded to the lowest and best bidder. However, the Owner reserves the right to accept or reject any or all bids or to waive any informality. For bids equaling or exceeding $50,000.00, bidder must indicate his Certificate of Responsibility number on the outside of the sealed proposal as required by the Mississippi Law. Minority and women's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material and/or supply needs. Any contract or contracts awarded under this invitation for bids are expected to be funded in whole or in part by anticipated funds from the Water Pollution Control Revolving Loan Fund (WPCRLF) loan program from the State of Mississippi. Neither the State of Mississippi, the Commission on Environmental Quality nor any of their employees is or will be a party to this invitation for bids or any resulting or related contracts. This procurement will be subject to all applicable sections of the Mississippi code of 1972, Annotated. Per the Mississippi Law, MS Code 31-3-21(3); any bid submitted by a non-resident contractor which does not include the non-resident contractor's current state law pertaining to such state's treatment of non-resident contractors, shall be rejected and not considered for award. If no such law exists in the non-resident contractor's state, then the non-resident contractor may provide statement to that effect. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. The OWNER's goal for minority-owned business participation as a percentage of construction cost is 3.6 %. The OWNER's goal for women-owned business participation is 2.1 %.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents