Similar Projects
Center Lake Shoreline Restoration
Infrastructure
Bidding
Warsaw, IN

Bridge and Small Structure Replacement and Pipe Lining
New Construction, Infrastructure
Bidding

Culvert Replacement
Post-Bid
Greenfield, IN

Lake Lemon Sediment Improvement
Post-Bid
$1,500,000 to $2,000,000 est. value
Unionville, IN

North Washington Road Drainage Improvements
Results
Fort Wayne, IN 46800

Lawrence Trades District Drainage Improvements
Results
$1,200,000 to $1,400,000 est. value
Indianapolis, IN

Small Structure Replacement
Infrastructure
Bidding

Drainage Structures 2021
Post-Bid
Paoli, IN

Taxilane Construction - Grading and Drainage
Results
Muncie, IN 47303

ADA Sidewalk Ramp Construction
Infrastructure
Bidding
IN

Pike Lake Shoreline Restoration
Post-Bid
Warsaw, IN 46580

Diane Drive Drainage Improvements and Water Main Replacement
Results
Fort Wayne, IN 46800

Small Structures and Drains Construction, Asphalt Resurface
Infrastructure
Bidding

Regulated Drains Maintenance
Post-Bid
Evansville, IN

Asphalt Resurface and Small Structure Pipe Lining
Results
IN

Reported 02/25/2022 12:00 AM
Project Title

Kemper Ditch, Arm 15 - Drain Tile Reconstruction

Physical Address View project details and contacts
City, State (County) Chesterton, IN 46304   (Porter County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a new drain tile system to replace a failed drain tile system. The overall purpose of the project is to enhance the drainage and storm water management services provided to the surrounding property owners by improving the area’s storm water infrastructure. The project generally includes the installation of drain tile, via open trench construction, and the installation of storm sewer structures. The project also includes road cut and repair work as needed to install the new drain tile across CR 375 E. It also includes other items incidental to the work including the creation and maintenance of a temporary construction entrance and construction access routes, including the use of timber access mats within delineated wetland areas, and the restoration of all areas disturbed during the performance of the work. Excess excavated material generated during the performance of the work is to be disposed of off-site, at an appropriate and, if applicable, properly permitted off-site location.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents