Similar Projects
HVAC Preventative Maintenance Services, NWS Romeoville, IL
Post-Bid
Romeoville, IL 60446

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

Connect B1 W Penthouse to Central Chiller Plant
Post-Bid
Marion, IL 62959

IVCC Building G AHU Replacement
Results
Oglesby, IL 61348

J041--Marion VA Medical Center Annual York Chiller Inspection and Preventive Maintenance
Post-Bid
Marion, IL

DOC-Sheridan-Outdoor Chiller for C3
Results
Sheridan, IL 60551

HVAC Inspection, Analysis & Preventative Maintenance
Term Contract
Post-Bid
Rockford, IL 61104

2020 HVAC Replacement
Results
Wheeling, IL 60090

Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

Hot Water Heater Replacement
Results
Rock Island, IL 61201

HVAC Services - Collinsville
Term Contract
Post-Bid
Collinsville, IL

Shawnee Community College Emergency HVAC
Renovation
Results
$75,000 to $100,000 est. value
Ullin, IL 62992

On Call HVAC Repair Services
Term Contract
Post-Bid
West Chicago, IL 60185

Reported 04/02/2021 12:00 AM
Project Title

2021 HVAC Improvements

Physical Address View project details and contacts
City, State (County) Washington, IL 61571   (Tazewell County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center - 03/11/21
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists generally of a HVAC renovations at Washington Community High School District #308 High School including replacement of existing HVAC systems in Ashbrook Building and installation of new hot water boilers including ductwork, piping, insulation, temperature controls, and electrical work. Substantial completion date for work in the Ashbrook Building is Friday, August 13, 2021. Substantial completion date for work in the Boiler Room is Friday, October 1, 2021.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents