Similar Projects
Weatherization at the Highway Garage
Bidding
Templeton, MA 01468

Entrance Alterations Grafton Memorial Municipal Center
Bidding
$73,000 est. value
Grafton, MA 01519

Removal and Construction of Stonewall
Post-Bid
Charlton, MA

Mercantile Center Facade Washing and Lighting
Post-Bid
Worcester, MA

Facade at 44 Hamilton Street
Results
Southbridge, MA

Exterior Renovations - South Worcester Neighborhood Center/DPW and P
Results
$214,000 est. value
Worcester, MA 01608

Phase II Exterior Recreation Yards at Souza Baranowski Correctional Center
Post-Bid
Less than $800,000 est. value
Lancaster, MA

Worcester Challenge and Reach Academy Window/Door/Roof and Boiler Replacement - Sub-Bids
Results
Less than $4,800,000 est. value
Worcester, MA 01609

Bagg Hall Restoration - Filed Sub-Bid
Post-Bid
$1,050,000 est. value
Princeton, MA 01541

Public Library Building Envelope Restoration - General Bids
Results
Less than $98,000 est. value
Oxford, MA 01540

Limestone Caps and Bands Repair
Post-Bid
Less than $12,000 est. value
Worcester, MA 01606

Oxford Public Library Building Envelope Restoration - Filed Sub Bids
Results
$140,000 est. value
Oxford, MA 01540

Sutton Town Hall Cupola Repair Project
Post-Bid
Less than $25,000 est. value
Sutton, MA 01590

Maintenance: Masonry Services/City
Term Contract
Results
Worcester, MA

Masonry Repair
Post-Bid
Winchendon, MA

Last Updated 03/27/2020 12:42 PM
Project Title

Parapet Cap Replacement - DCU Center / EAM

Physical Address View project details and contacts
City, State (County) Worcester, MA 01608   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Masonry
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the demolitions and removal of the existing precast concrete coping, and replacement with new metal coping, as well as removal and reinstallation of the existing lightning protection system. All existing construction of the parapet wall shall remain and be protected over the course of the construction.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents