Similar Projects
Constitution Plaza
New Construction, Infrastructure
Conception
$10,500,000 CJ est. value
Fort Myers, FL 33967

North Area 3 Irrigation Potable Water and Wastewater - CN336317 - City Of Cape Coral
Renovation, Infrastructure
Conception
$211,473,398 CJ est. value
Cape Coral, FL 33904

Skyline Boulevard Retail
New Construction, Infrastructure - 4,000 SF
Design
$1,000,000 CJ est. value
Cape Coral, FL 33914

ADA Ramp and Mat Improvements
Infrastructure
Design
$2,731,702 CJ est. value
Cape Coral, FL 33904

Countywide Arterials- Bonita Beach Road and College Parkway
Infrastructure
Bidding
$2,000,000 CJ est. value
Fort Myers, FL 33901

Bell Boulevard Water Main Extension
Infrastructure
Bidding
$600,000 CJ est. value
Lehigh Acres, FL 33974

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Reclaimed Water Transmission Main Caloosahatchee River Crossing
Infrastructure
Post-Bid
Cape Coral, FL 33990

Nicholas Parkway West Access Management and Watermain Improvement
Results
Cape Coral, FL

Crystal Drive Water Main Improvements
Results
FL

Multi Commercial Development - Sitework
Infrastructure
Construction
Lehigh Acres, FL 33971

The Waters of Cape Coral
New Construction, Infrastructure - 83,500 SF
Construction
$22,000,000 CJ est. value
Cape Coral, FL 33991

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

Imperial Crossing
New Construction, Infrastructure - 45,000 SF
Pending Verification
$45,000,000 CJ est. value
Bonita Springs, FL 34135

North Area 4 Irrigation Potable Water and Wastewater - CN436317 - City Of Cape Coral
Renovation, Infrastructure
Conception
$98,297,921 CJ est. value
Cape Coral, FL 33904

Last Updated 08/25/2022 04:32 PM
Project Title

North Area 1 Irrigation Potable Water and Wastewater - CN136317 - City Of Cape Coral

Physical Address View project details and contacts
City, State (County) Cape Coral, FL 33904   (Lee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined This project is included in the City of City of Cape Coral Fy 2022 Capital Improvement Plan (CIP). As of January 17,2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents