Similar Projects
Bonita School Road Bridge Replacement - Santa Barbara County
New Construction, Infrastructure
Conception
$42,000,000 est. value
Santa Maria, CA 93458

Solstra Mixed Use Development / Solomon Hills
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Santa Barbara, CA 93105

701 N. Milpas Mixed-Use
Demolition, New Construction, Infrastructure - 90,721 SF
Design
$15,800,000 CJ est. value
Santa Barbara, CA 93103

701 N. Milpas Mixed-Use
Demolition, New Construction, Infrastructure - 90,721 SF
Design
$15,800,000 CJ est. value
Santa Barbara, CA 93103

IDIQ MACC for Natural Gas and POL Fuel System Projects at Various Government Installations within the NAVFAC SW Area of Responsibility
Renovation
Post-Bid
$50,000 to $10,000,000 est. value

Renovate Military Working Dog Obedience Course
Renovation
Post-Bid
$5,000,000 est. value
Vandenberg Air Force Base, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Cleveland Elementary School New Classrooms and Site Improvements Project
Demolition, New Construction, Infrastructure
Construction
$3,848,000 CJ est. value
Santa Barbara, CA 93103

2022 Street Pavement Digout Project
Infrastructure
Construction
$1,882,176 CJ est. value
Lompoc, CA 93436

In-N-Out - McMurray Road / Buellton
New Construction, Infrastructure - 3,885 SF
Pending Verification
$1,200,000 CJ est. value
Buellton, CA 93427

In-N-Out - McMurray Road / Buellton
New Construction, Infrastructure - 3,885 SF
Pending Verification
$1,200,000 CJ est. value
Buellton, CA 93427

Bridges: Hollister Street Bridge Replacement At Tecolotito Creek - City Of Santa Barbara
Demolition, New Construction, Infrastructure
Conception
$11,700,000 CJ est. value
Santa Barbara, CA 93111

Tyler Winery (Tier II)
New Construction, Infrastructure - 17,004 SF
Design
$2,000,000 CJ est. value
Lompoc, CA 93436

Construction Manager - To Provide Construction Management and Monitoring/Inspection Services The Westside Community Paseos Project
Infrastructure
Post-Bid
$3,450,000 est. value
Santa Barbara, CA

Last Updated 10/18/2023 08:03 PM
Project Title

RFQ D/B - GBSD Consolidated Maintenance Facility Vandenberg Space

Physical Address View project details and contacts
City, State (County) Vandenberg AFB, CA 93437   (Santa Barbara County)
Category(s) Commercial, Entertainment/Recreation, Government/Public, Heavy and Highway, Laboratory, Sewer and Water
Sub-Category(s) Communication Building, Convention/Exhibit Center, Laboratory, Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $250,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project no: BMC21061 Design and Construct a 13,789 square meter (SM) multi story Consolidated Maintenance Facility for the Ground Based Strategic Deterrent (GBSD) at Vandenberg Space Force Base, CA to support GBSD Test, Launch Operations and accommodate a crew of 250 personnel. The primary facility will be used to house the Flight Test Squadron for GBSD Intercontinental Ballistic Missiles (ICBMs). Project will include Advance Program Office/Security Program Office area that shall meet special access program facility requirements and be large enough to support security personnel and Cyber Information Technology personnel. Advance Program Office/Security Program Office shall consist of offices, one large conference room and two smaller conference rooms. In addition to the offices, laboratories, storage areas, and vehicle storage structures, the project will consist of secure/non-secure internet protocol router communication systems, electrical/mechanical services, and distribution components/systems, water and sewer, fire protection, lightning protection, security systems, and overhead cranes in the high bays to lift critical hardware and support equipment in and out of Transporter Erectors, Maintenance Vans, and other support vehicles. As the facility will be located adjacent to the missile route, all Intercontinental Ballistic Missiles vehicles will be maintained, and stored within this complex. The facility will have secure storage rooms, labs and a codes vault that will be built to Intelligence Community Directive 705 standards. The class B codes vault contains a Class A vault. Site improvements include clearing, grubbing, grading, demolition, as applicable, paving, walkways, and storm drainage. The Facility will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01.Sustainable principles, to include life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life-cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. Design-Build, GBSD Consolidated Maintenance Facility, Vandenberg Space Force Base, California. North American Industry Classification System code - 236220. Size Standard $39,500,000.00. The magnitude of construction is $100,000.00 - $250,000,000.00. This is a Two-Phase Design-Build Source Selection. One solicitation covers both phases. Proposals will be evaluated in Phase One to determine which offerors will submit proposals for Phase Two. After evaluating phase-one proposals, the Source Selection Authority (SSA) will select the most qualified offerors and request that only those offerors submit phase-two proposals. Phase two of the solicitation will be prepared in accordance with FAR 15, and include phase-two evaluation factors, developed in accordance with FAR 15.304. This is Phase One. Phase-one does not include the submission of a cost/price proposal. This is a Full and open procurement. In accordance with Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation

Details

148,424 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Audio-Visual Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Laboratory Furniture, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents