Similar Projects
Gymnasium HVAC System
Results
Carlisle, PA 17013

Elmwood Academy – Phase III Additions and Renovations (HVAC Construction)
Results
$765,000 est. value
Mechanicsburg, PA 17055

Broad Street Elementary School Additions and Renovations -HVAC
Results
Mechanicsburg, PA 17055

HVAC Maintenance -DSCA Mechanicsburg, PA
Post-Bid
Mechanicsburg, PA 17050

Municipal and Public Works Building Renovations - Heating, Ventilating and Air Conditioning Construction
Results
Boiling Springs, PA 17007

Packaged Rooftop Unit/Outdoor Air Handling Unit No. 2 (RTU-2) Replacement
Results
Less than $99,688 est. value
Camp Hill, PA

Packaged Rooftop Unit/Outdoor Handling Unit No 2 (RTU-2) Replacement
Results
Camp Hill, PA 17011

Boiler Plant Air Compressor
Results
Less than $12,420 est. value
Camp Hill, PA 17001

Good Hope Middle School and Hampden Elementary School - Mechanical
Results
$12,000,000 to $14,000,000 est. value
Mechanicsburg, PA 17050

Health Occupation Suite - Heating, Ventilating and Air Conditioning Construction
Post-Bid
$104,600 to $153,500 est. value
Mechanicsburg, PA 17050

Northside Elementary School Additions and Renovations - HVAC Construction
Results
$1,371,873 est. value
Mechanicsburg, PA 17055

HVAC and Mechanical Products
Term Contract
Post-Bid

Packaged Rooftop Unit/Outdoor Air Handling Unit No. 2 (RTU-2) Replacement 2021
Post-Bid
Camp Hill, PA 17011

Lower Allen Commons Retail Center - Mechanical (HVAC/Plumbing
Bidding
Camp Hill, Lower Allen, PA 17011

Big Spring High School Boiler Replacement
Bidding
Newville, PA 17241

Reported 07/09/2020 12:00 AM
Project Title

DLA Distribution Susquehanna Air Compression System

Physical Address View project details and contacts
City, State (County) Mechanicsburg, PA 17055   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Air compressors shall be brand name or equal to Quincy QGDV-25 Rotary Air Compressor: contractor to remove an existing overhead compressed air system, design of a redundant loop compressed air system to provide 100-120 CFM of dry air to the box shop processes, install a new overhead compressed air system, and perform a factory authorized start-up to validate the warranty. The new equipment will consist of two (2) new air compressors, two (2) new air dryers, a 400 gallon air storage tank, a 3 stage oil water condensation separator, and an overhead air grid loop consisting of approximately 600 linear feet of 1.5 inch pipe with fifteen (15) 1 inch drops at designated locations in the box shop.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents