Similar Projects
Construction of Joiner Road Water Treatment Plant - New Treatment Facility Well No. 4
New Construction
Bidding
Tennille, GA 31089

Water Supply Wells 13 and 14
Term Contract
Bidding
$300,000 est. value
Sandersville, GA

Warner Range Potable Water Well
Post-Bid
Columbus, GA 31901

Pearl Street Well Replacement
Post-Bid
Shellman, GA

2020 Water System Improvements - Andrews Well 2
Results
Carnesville, GA 30521

F. Wayne Hill Water Resources Center (WRC) Backwash Waste Pump Replacement
Results
Buford, GA 30519

Well 5 Improvements
Infrastructure
Bidding
$300,000 est. value
Maysville, GA

Bypass Pumping Services on an Annual Contract
Term Contract
Post-Bid
GA

Contract A: New Well and Chemical Feed System
Results
Less than $800,000 est. value
Abbeville, GA

Fuel Pump Dispenser Replacement
Infrastructure
Bidding
$50,000 est. value
Augusta, GA

Water Softening System
Infrastructure
Post-Bid
Mount Vernon, GA

Booster Pump & Water System Improvements
Results
$328,000 est. value
Georgetown, GA

Sanitary Sewer System Improvements
Infrastructure
Bidding
$400,000 est. value
Odum, GA

Drinking Water Filteration System
Renovation, Infrastructure
Post-Bid
Waynesboro, GA

Fire Pumps and DW Pumps Maintenance and Repair
Term Contract
Results
Atlanta, GA 30303

Last Updated 05/19/2022 12:36 AM
Project Title

Well #15 And #16 Rehabilitation and Upgrades

Physical Address View project details and contacts
City, State (County) Albany, GA 31707   (Dougherty County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the Project includes improvements to the City’s Well No. 15 & Well No. 16. The Contractor will mobilize and perform a pump test to determine well capacity, static water level, and pumping water level. Contractor shall pull the pump and perform a preliminary video inspection of the well; well casing & screens are to be cleaned, post cleaning video inspection completed, and pump and motor upgrades performed to meet required duty conditions. Existing pump base will be demolished and reconstructed to meet Georgia EPD minimum standards and discharge piping, valves, fittings, etc. will be replaced to match up to new pump discharge head elevation as detailed in the plans. Electrical and control improvements will also be made as detailed in the plans. All materials shall be provided by Contractor except where noted to re-use or re-build existing items on plans. Once all improvements have been completed the Contractor will be responsible for performance testing, disinfection, sampling, and laboratory testing necessary to place the well back in service

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents