Similar Projects
Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

Phase 1 Sewer Rehabilitation Group 2 Relay
Infrastructure
Bidding
Memphis, TN

Sewer Main Extension
Infrastructure
Bidding
Cleveland, TN

East Ridge Basin 1-75 Collector Sewer Project
Post-Bid
Chattanooga, TN 37402

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Amos Road Force Main Replacement
Results
Less than $834,825 est. value
Chattanooga, TN 37400

Manhole Components
Term Contract
Results
Less than $100,000 est. value
Chattanooga, TN

Sprinkler System
Renovation
Construction
Clarksville, TN 37040

Sewer Line Relocation
Infrastructure
Bidding
$60,000 est. value
Kimball, TN

Design/Build Services to Repair/Replace the Sanitary Sewer System at the Jacobs Civilian Conservation Center
Post-Bid
$500,000 to $1,000,000 est. value
Bristol, TN

East Ridge Sewer Basin 3C and 4B Rehabilitation
Results
Chattanooga, TN

Sewer Grinder Station Installation
New Construction
Bidding
$143,000 est. value
Kimball, TN

Upper Station Camp Creek Sewer Extension
Post-Bid
Gallatin, TN

Sequatchie Water Booster Pump Station
Results
Jasper, TN 37347

2021 Sewer System Rehabilitation
Infrastructure
Bidding
Hendersonville, TN

Last Updated 12/06/2021 04:03 PM
Project Title

Industrial Park Pump Station and Force Main

Physical Address View project details and contacts
City, State (County) Columbia, TN   (Maury County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing and installation of a Wet Well Mounted Wastewater Pumping Station Control Panel and Valve Package with 180 GPM Duplex Submersible Pumps, including submersible transducer liquid level control system with float backup system; heated and vented enclosure; valves; piping; pump start-up testing; certification of installation; electrical controls, epoxy coating of new wet well sections; installation of approximately 6,420 linear feet of new 6-inch force main; external emergency pumping connection, and all other equipment and work required.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents