Similar Projects
Lamar Consolidated High School Tennis Courts/Parking, Shotput and Discus - Educational Bond 2020 Prop A - Lamar Consolidated Independent School District
Infrastructure
Conception
$2,798,007 CJ est. value
Rosenberg, TX 77471

Mandola Commerical Sewer Line - WW2203 - City of Richmond
Infrastructure
Conception
$525,000 CJ est. value
Richmond, TX 77406

Orchestra Room Additions at Briscoe JHS, Foster HS, Reading JHS, George Ranch HS, Leaman JHS, and Fulshear HS
Addition, Demolition, Infrastructure - 4,400 SF
Design
$6,300,000 CJ est. value
Richmond, TX 77469

Sugar Land Regional Airport Runway 17/35 Rubber Removal and Paint Markings
Infrastructure
Design
$50,000 CJ est. value
Sugar Land, TX 77498

Shannon PP Intake Temporary Shoring Project
Infrastructure
Bidding
$1,534,700 CJ est. value
Sugar Land, TX 77479

Shannon PP Intake Temporary Shoring Project
Infrastructure
Bidding
$1,534,700 CJ est. value
Sugar Land, TX 77479

Mustang Bayou Wastewater Treatment Plant Expansion and Rehabilitation Project
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,600,000 CJ est. value
Fresno, TX 77545

Construction of Irrigation Pump Station No. 3 and Makeup Well No. 2 Improvements Along Katy Gaston Road
Infrastructure
Post-Bid
Katy, TX 77494

Lift Station Control Panel Replacement Project
Results
Sugar Land, TX 77487

Lift Station Rehabilitation for Elkins (No. 24), Baybridge (No. 28), Commonwealth (No. 30) and Auburn Trails (No. 401)
Results
Less than $1,657,000 est. value
Sugar Land, TX 77479

TDPS Driver License Office - Rosenberg
New Construction, Infrastructure - 23,212 SF
Construction
$3,400,000 CJ est. value
Rosenberg, TX 77471

WhiteWater Express Car Wash / Richmond
New Construction, Infrastructure - 4,167 SF
Pending Verification
$1,600,000 CJ est. value
Richmond, TX 77406

Malabar Hill Retail
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Missouri City, TX 77459

Well Rehabilitation at Edgar Water Well - WA2202 - City of Richmond
Renovation, Infrastructure
Conception
$331,000 CJ est. value
Richmond, TX 77469

Lake Olympia at Vicksburg / The Shops at Lake Olympia
New Construction, Infrastructure - 17,400 SF
Design
$1,479,000 CJ est. value
Missouri City, TX 77489

Last Updated 09/21/2022 01:51 PM
Project Title

Third Storm Water Pump Station

Physical Address View project details and contacts
City, State (County) Sugar Land, TX 77479   (Fort Bend County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Civil Engineer - 05/26/22
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of perimeter fence, walls and gates to the Pump Building of Third Storm Water Pump Station Join Microsoft Teams Meeting +1 469-666-3216 United States, Dallas (Toll) (877) 286-5733 United States (Toll-free) Phone Conference ID: 494 454 910# Local numbers | Reset PIN | Learn more about Teams | Meeting options Join with a video conferencing device 176484854@teams.bjn.vc VTC Conference ID: 111 845 139 0 Alternate VTC dialing instructions

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents