Similar Projects
2021 King Road East Water Main Extension Project
Alteration
Bidding
Ithaca, NY

Hamilton Brown and Bushnell Shore Water District Improvement Project
Alteration
Bidding
$650,000 est. value
Hamilton, NY

Lead Water Service Line Replacements
Term Contract
Post-Bid
Newburgh, NY 12550

Furnishing Water Materials for the Department of Public Utilities - 2020
Term Contract
Post-Bid
Troy, NY 12180

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Genesee County Phase 2 Water Supply Contract 2 Chestnut Ridge Road Water Main
Results
NY

Water Main Renewal Extensions and Improvements 2021
Infrastructure
Bidding
$168,000,000 est. value
Rochester, NY

Large Main Rehabilitation - Various Locations
Post-Bid
Buffalo, NY 14202

Holley Sidewalk Reconstruction and Waterline Improvements
Results
Less than $2,523,046 est. value
Holley, NY 14470

Furnish Onondaga Lake Marina and Yacht Club Water Line Replacement Project
Infrastructure
Bidding
NY

Water District No. 9 - Water Main Installation
Post-Bid
Albion, NY 14411

Interconnection Transmission Main at Rumbrook Pump Station
Results
Greenburgh, NY 10607

Valves-Pump Check Valves and Replacement Parts Dezurik
Term Contract
Bidding
NY

Plug Valves
Post-Bid
Yonkers, NY 10705

Bruen Place and Street James Place Water Main Improvements
Results
Goshen, NY 10924

Last Updated 06/29/2021 08:46 AM
Project Title

Condenser Water Piping Replacement at SUNY New Paltz

Physical Address View project details and contacts
City, State (County) New Paltz, NY   (Ulster County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. At Coykendall Science Building (CSB): Includes the replacement of 8” and smaller steel condenser water supply and return piping between the point where it enters the pipe tunnel in the Ground Floor Mechanical Equipment Room and the existing roof mounted cooling tower. The steel piping will be replaced with polypropylene piping. New valves, fittings, supports and instrumentation will be required. Piping exposed outdoors shall be insulated and clad in aluminum. To access piping, certain ceilings will be removed and replaced, and certain shafts or chases will be opened to perform work and later repaired. 2. At Student Union Building (SUB): Includes the replacement of 10” and smaller steel condenser water supply and return piping between the existing electric chiller in the Basement level Mechanical Equipment Room and the roof mounted cooling tower. The existing cooling tower will be replaced as well. The steel piping will be replaced with polypropylene piping. New valves, fittings, supports and instrumentation will be required. Steel dunnage supports for the cooling tower will be modified and augmented. Piping exposed outdoors shall be insulated and clad in aluminum. To access piping, certain ceilings will be removed and replaced, and certain shafts or chases will be opened to perform work and later repaired. 3. Old Main Building (OMB): Base Bid: Includes the replacement of 8” and smaller steel condenser water supply and return piping limited to that on the roof and running to the existing roof mounted cooling tower. The steel piping will be replaced with polypropylene piping. New valves, fittings, supports and instrumentation will be required. Piping exposed outdoors shall be insulated and clad in aluminum.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents