Similar Projects
Pest Control Services
Term Contract
Bidding
Cincinnati, OH

Pest Control Services
Term Contract
Bidding
Cincinnati, OH

Fair Housing Services
Post-Bid
Bowling Green, OH

Ice Breaking Services on Vermilion River
Term Contract
Post-Bid
Vermilion, OH

Z--Operations, Maintenance, and Repair Services for EPA Cincinnati
Results
Cincinnati, OH 45268

Z--Operations, Maintenance, and Repair Services for EPA Cincinnati
Results
Cincinnati, OH 45268

Portable Restroom Rental and Service
Post-Bid
Sandusky, OH

Water Testing And Treatment Services For Boilers, Cooling Towers And Closed Loop Water Systems At All District Facilities - Moddie Faye Davis - Operations-Required
Term Contract
Results
Less than $150,000 est. value
Cleveland, OH 44115

3-Year Bid
Post-Bid
Bryan, OH 43506

Portsmouth Infrastructure Support Services
Results
Portsmouth, OH

Providing Unit Make Ready Services
Post-Bid
Canton, OH

S--CUVA Septic Service
Term Contract
Results
Akron, Brecksville, Cuyahoga Falls, Hudson, Iberia, Independence, Peninsula, Sagamore Hills, Valley City, Valley View, Valleyview, OH 44264

Vacancy Prep Unit Turnover (Make Ready) Services
Post-Bid
Cincinnati, OH

Substation Preventative Maintenance and Repair Services
Renovation
Results
$1,200,000 est. value
Valley View, OH 44125

Pest Control Services
Post-Bid
Cincinnati, OH

Reported 02/08/2022 12:00 AM
Project Title

IMOR, Institutional Maintenance Operations and Repair

Physical Address View project details and contacts
City, State (County) Cleveland, Sandusky, OH 44135 (Cuyahoga, Erie Counties)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The NASA GRC has a requirement for Institutional Systems and Central Process Systems (CPS) operations, maintenance, repair and recertification services. The majority of the services required under this solicitation are for the GRC Lewis Field (LF) campus, but there are selected services required at Neil A. Armstrong Test Facility (ATF) as well. The NASA GRC encompasses two sites: LF in Cleveland, Ohio and ATF in Sandusky, Ohio. GRC LF is comprised of 298 acres and includes 79 active buildings and 92 structures and systems (electrical substations, large compressors/exhausters, distributed control, cooling towers, underground utilities, etc.). The buildings at LF enclose a total of 2.25 million square feet of floor area which consists of Propulsion & Aerospace R&D Test Facilities (63%), Administrative Offices (27%) and Warehouse/Storage/Shop Area (10%). Currently, 70% of these facilities are 60 years old or older. GRC ATF is comprised of 6,377 acres and includes 130 active buildings and 39 structures and systems. The buildings at ATF enclose a total of 584,000 square feet of floor area which consists of Propulsion and Aerospace R&D Test Facilities (42%), Administrative Offices (14%) and Warehouse/Storage/Shop Area (44%). Currently, 70% of these facilities are 60 years old or greater. The IMOR contract shall furnish all labor, supervision, tools, materials, equipment, transportation, and management necessary for the operation, maintenance and repairs of Institutional Systems and CPS. This includes operations, maintenance and repair of CPS equipment, high voltage electrical substations, cryogenic systems, institutional buildings, systems, structures, grounds, and paved surfaces at the NASA GRC LF Campus and selected services at ATF. It also includes certification services for all pressurized vessels & systems at LF and ATF campuses. Contractors shall utilize NASA Policy Requirement 8831.2E Facilities Maintenance and Operations Management as an advisory document for all provided services.

Details

Division 01 - General Requirements, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents