Similar Projects
Newport Harbor High School Home Arts Courtyard
Renovation, Infrastructure
Bidding
$825,000 est. value
Newport Beach, CA 92663

Camino Capistrano Pavement Rehabilitation Project
Infrastructure
Bidding
$8,500,000 est. value
San Juan Capistrano, CA

Replace Existing Damaged Signal Pole
Infrastructure
Post-Bid
$169,442 est. value
CA

Modify Striping and Signs, Update Curb Ramps and Signals
Infrastructure
Post-Bid
$271,815 est. value
Fullerton, CA

Update signals and install safety lights
Infrastructure
Results
$1,090,000 est. value
CA

Annual Sidewalk And Curb Access Ramp Improvements
Alteration
Results
$290,000 est. value
La Habra, CA 90632

West Parking Lot Renovation Project at Anaheim Campus
Infrastructure
Bidding
$1,050 est. value
Anaheim, CA 92801

Arterial Sidewalk Removal and Replacement at Various Locations Phase Six
Infrastructure
Post-Bid
$350,000 est. value
Anaheim, CA

Arterial Rehabilitation
Infrastructure, Alteration
Results
$834,200 est. value
Cypress, CA 90623

Alley No. 27, 45, and 86 Improvement FY 2020-21
Infrastructure
Bidding
$150,000 est. value
La Habra, CA 90631

Skate Park Upgrades
Alteration
Post-Bid
$960,000 est. value
Brea, CA

MacArthur Boulevard Regional Traffic Signal Synchronization Program
Infrastructure
Results
$800,000 est. value
Irvine, CA 92618

Pace Parking Lot Repair
Infrastructure, Alteration
Bidding
$200,000 est. value
Garden Grove, CA 92843

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Turtle Rock Community Park Parking Lot Rehabilitation
Infrastructure
Results
$680,000 est. value
Irvine, CA 92606

Last Updated 05/30/2022 01:00 AM
Project Title

Traffic Signal Improvements at the Intersection of Main Street and Delaware Street

Physical Address View project details and contacts
City, State (County) Huntington Beach, CA 92648   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this Contract will consist of modifying one traffic signal to add protected left-turn phasing on Main Street and constructing ADA compliant ramps. The work will include the removal of existing and installation of new electrical conduit, pull boxes, traffic signal poles and foundations, construction of ADA compliant ramps and sidewalk improvements at the intersection of Main Street and Delaware Street.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents