Similar Projects
Last Updated | 09/27/2022 12:05 PM |
Project Title | United Township High School - Pool Bar Joists Repairs |
Physical Address | View project details and contacts |
City, State (County) | East Moline, IL 61244 (Rock Island County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $45,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope includes shoring of roof structure, removal of CMU walls, removal of corroded bar joist ends, welding in of new steel bar joist ends, reinstallation of CMU walls, new prefinished steel siding, new aluminum soffit, painting and related work. Documents will be available for downloading from Mimecast. Contractors are responsible for registration, fees, etc. for use of this site. It is solely the contractor's responsibility to verify that he is downloading all drawings, all specifications, and all addenda for this project. No additional cost will be allowed by the Owner for the contractor's failure to download all material. Contractors to request access to downloads by calling the Architect's Moline office or by emailing at jwojak@brayarch.com or mmiller@brayarch.com. Contractor will receive email notice and invitation to view project folder to download drawings, specifications, addenda, etc. Contract documents are made available only for the purposes of this Project. Their use does not grant a license for other purposes. Printed hard copies of the documents are available for purchase by the Contractor from: 1. Rapids Reproductions, Inc., 3875 Elmore Avenue, Suite C, Davenport, Iowa 52807 Phone: 563-445- 3081, ATTN: Mark Hoover. markh@rapidsrepro.com. 2. Contractor must call ahead to order sets of documents as this is a print-to-order project. The Owner reserves the right to accept Bidder's Base Bid, accept any one or more of the Bidder's Alternate Bid's, reject any or all Bids, award contract based on its investigation of the Bidder's, as well as acceptance of Alternates all of which the Owner deems to be in its best interest and waive any informalities or minor irregularities in the Bids and waive minor irregularities in the bidding procedure, all at the Owner's discretion. The Owner nor the Architect will be providing additional SETS of drawings for construction use. It is each Contractor and Sub-Contractor responsibility to review and obtain FULL SETS of construction documents and addendums for bidding and construction purposes. No additional sets of plans and specifications will be issued by the Owner or the Architect for construction. Any Contractor wishing to be added to the Plan Holders List that received or reviewed documents at any of the following plan exchanges must contact jwojak@brayarch.com A certified check, a cashier's check or a bid bond payable to the Owner in an amount not less than 5% of the maximum bid shall accompany each bid as a guarantee that if the bid is accepted, the Bidder will execute and file the proposed contract and bond within ten days after the award of contract. Prevailing Wage Rates: A. All Contractors must pay the Prevailing Wage Rates as established by the Illinois Department of Labor. Contractor shall submit with each payment request the weekly payroll forms required by the Davis-Bacon Act (40-U.S.C. 327 et seq. (1982)). Payroll form WH-347 or similar information. Payroll forms shall be submitted (one copy) for each person employed on the jobsite by each contractor and all subcontractors. Bidders shall bring discrepancies, omissions and conflicts of doubt as to true meaning of any part of the contract documents to the attention of Architect, Mark Miller at 309.517.5073 by Monday, September 26, 2022. Illinois Preference Act: A. All contractors, subcontractors, and those supplying labor to this project shall comply with the "Employment of Illinois Workers on Public Works Act" (30 ILCS 570/) commonly referred to as the Illinois Preference Act |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |