Similar Projects
West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

Corrugated Polyethylene Pipe, Sure-Lok Tee'S and Fittings
Infrastructure
Bidding
Gonzales, LA

Hurricane Damage Repairs Grant Walker 4-H Educational Center
Infrastructure
Bidding
Pollock, LA 71467

Luling Pe Office Flood Damage Repairs
Infrastructure
Post-Bid
$50,000 to $100,000 est. value
Luling, LA 70070

Cypress Island/Joe Daigre Drainage System Maintenance Project - Phase I
Infrastructure
Post-Bid
Saint Martinville, LA

LA 1 - Port Allen Canal Br Repl (PH1)(HBi)
Infrastructure
Results
$50,000,000 to $70,000,000 est. value
Shreveport, LA 71115

Airline at Clearview Intersection Improvements
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
New Orleans, LA 70119

HMGP Canal Crossing Project - Missouri Street at Corinne Canal Project
Infrastructure
Bidding
Chalmette, LA 70043

Biloxi Marsh Living Shoreline Project
Infrastructure
Post-Bid
$50,500,000 est. value
LA

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

Midway Drive Drainage Improvements (Jefferson Hwy. To Charlotte Dr.)
Infrastructure, Alteration
Bidding
Gretna, LA

Walter O. Bigby Carriageway Drainage Pump Station
Infrastructure
Post-Bid
$3,900,000 est. value
Bossier City, LA

I-49 Interch: LA 726/LA 98/Pont Des Mouton
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Lafayette, LA

Holden Highway 190 Drainage Crossing Project
Infrastructure
Bidding
Livingston, LA

Reported 10/21/2021 12:00 AM
Project Title

Price Street Canal Parallel Drainage Outlet

Physical Address View project details and contacts
City, State (County) Plaquemine, LA   (Iberville County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work is generally described as follows: Installation of approximately 2,000 L.F. of 78 inch corrugated metal pipe (CMP) parallel to an existing 78 inch CMP within Price Street Canal. The project also includes articulated concrete block revetment pipe end treatments, lateral drain connections, surface drain inlets, grading, etc

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents