Similar Projects
HVAC Upgrades
Alteration
Bidding
$200,000 est. value
Hodgenville, KY

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Chiller Replacement and Controls Upgrade
Results
Liberty, KY 42539

Harrison County Middle School Football Field Improvements
Results
Cynthiana, KY 41031

Installation of HVAC Systems
Post-Bid
Hustonville, KY 40437

Shelby County High School Renovation
Renovation
Results
Shelbyville, KY 40065

Mechanical HVAC - Boiler Replacement
Post-Bid
Stanford, KY 40484

Area Technology Center Improvements
Renovation, Addition
Results
Less than $5,000,000 est. value
Hartford, KY 42347

Clay County High School Athletic Improvements - Phase 1
Post-Bid
Manchester, KY 40962

Bourbon County High School Greenhouse
Results
Paris, KY 40361

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

KCIW Pine Bluff Chiller Replacement
Results
$127,262 est. value
Pewee Valley, KY 40056

HVAC Upgrades and Exhaust Fans
Alteration
Post-Bid
Eddyville, KY

HVAC RTU Unit for Courthouse
Alteration
Results
Calhoun, KY

Last Updated 05/10/2022 03:27 PM
Project Title

Middle-High School HVAC Upgrades in Main and Auxiliary Gyms

Physical Address View project details and contacts
City, State (County) Beattyville, KY 41311   (Lee County)
Category(s) Education, Single Trades
Sub-Category(s) HVAC, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected December 2021, Construction Completion Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from MEP Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the provision and installation of two new HVAC units, controls, duct work, hydronic piping, power, fire alarm, and associated demolition work to upgrade the HVAC systems in the main and auxiliary gymnasiums. The scope of work for this construction project includes but is not limited to: selective building demolition, duct installation, hydronic piping, insulation, HVAC controls, power, fire alarm, and miscellaneous structural supports. The work effort will be executed in one principal phase beginning on or around December 1, 2021 and ending on May 2, 2022 (for Final Completion). The building will be occupied during construction work. The Contractor will be required to coordinate the contract work with daily school activities in the building and on the site.

Details

Division 01 - General Requirements.
Division 04 - Masonry.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents