Similar Projects
Snow Removal Services, Cargo Inspection Facility, Detroit, MI
Design
Detroit, MI 48216

Snow Blowing and Snow Removal Services
Post-Bid
Sault Sainte Marie, MI 49783

Seasonal Snow Removal
Post-Bid
Mount Pleasant, MI

Snow Removal for DEQ 635 Filley Street District Office
Results
Lansing, MI

Waste Disposal and Recycling Services
Results
Less than $60,000 est. value
Wayne, MI

2019-2020 Snow Removal
Post-Bid
Niles, MI

Lawn Mowing/Snow Removal
Results
Less than $1,860 est. value
Port Huron, MI

Snow Removal and Ice Management Services for the 2019/2020 Snow Season for the Romulus Athletic Center.
Term Contract
Post-Bid
MI

Dart Auditorium-Fire Curtain And Rigging Replacement
Results
Pinckney, MI

Snow Removal Services - Multiple Sites
Post-Bid
Detroit, MI

Property Maintenance
Term Contract
Results
Kalamazoo, MI

Bridge Icicle Removal
Term Contract
Post-Bid
MI

Neighborhood Stabilization Program - Right of First Refusal
Results
Garden City, MI

Hillman Fire Department Snow Removal
Post-Bid
Hillman, MI 49746

Aqueous Film Forming Foam (Afff) Collection and Disposal
Results
Lansing, MI

Last Updated 04/10/2020 02:20 AM
Project Title

DNR Charles Mears State Park - Sand Relocation Project 2020

Physical Address View project details and contacts
City, State (County) Pentwater, MI   (Oceana County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Drifted sand in areas north and south of beach parking lot entrance roads (areas “B” and “C”) is to be removed down to the level of the roads and parking lot and hauled to the north end of the swim beach, and graded as stipulated in the area “A” guidelines below. The areas are to then be graded and leveled between the beach area parking lot and the campground and park entrance roads. 2. Drifted sand in the volleyball court (area “D”) is to be removed and relocated to area “A”. The volleyball court is to be leveled flat. The dimensions of the court will be a 40’ by 65’ flat rectangle using the existing posts as the center line. 3. Beach sand will be pushed and graded on a continuous declining slope from the walkway to the water’s edge in a manner dictated by the Park Supervisor or his representative. Area to be graded in this manner is illustrated as “Area A” on the map provided at the pre-bid meeting. 4. Vehicles and equipment used by the vendor will not be allowed on walkways or patios without prior approval of Park Supervisor.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents