Last Updated | 02/16/2023 03:28 PM |
Project Title | Central Park Waterpark Cabana Addition Project |
Physical Address | View project details and contacts |
City, State (County) | Carmel, IN 46032 (Hamilton County) |
Category(s) | Entertainment/Recreation, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Misc. Recreational, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $450,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the Work for the Project consists of demolition, concrete flatwork, installation of owner purchased cabana structures, ornamental fencing, electrical, landscaping, and storm sewer, all as set forth in the Contract Documents for the Project which, except for those items not included due to timing, size or other factors, have been assembled into a Project Manual and includes the Bid Documents. For special accommodations needed by individuals with disabilities planning to attend the pre-bid conference or public bid opening meeting, please notify Michael Krosschell at (317 414-7398 or krosschellm@weihe.net at least forty-eight (48) hours prior thereto. Bidders shall assure that they have obtained complete sets, whether hard copy or electronic, of the Project Manual and drawings and shall assume the risk of any errors or omissions in Bids prepared in reliance on incomplete sets. Bids must be submitted on the forms in the Project Manual, must contain the names of every person or company interested therein, and shall be accompanied by: (1) Properly and completely executed Form 96 (revised 2013) prescribed by the Indiana State Board of Accounts which includes a financial statement, a statement of experience, a proposed plan or plans for performing the Work and the equipment the Bidder has available for the performance of the Work; (2) Bid Bond in the amount of ten percent (10%) of the total Bid amount, including any alternates, with a satisfactory corporate surety or by a certified check on a solvent bank in the amount of ten percent (10%) of the amount of the Bid. The Bid Bond or certified check shall be evidence of good faith that the successful Bidder will execute within ten (10) calendar days from the acceptance of the Bid, the Agreement as included in the Project Manual. The Bid Bond or certified check shall be made payable to Carmel/Clay Board of Parks & Recreation; (3) A Non-Collusion Affidavit complying with the requirements of Ind. Code 36-1-2-4. Owner reserves the right to hold any or all Bids for a period of not more than sixty (60) days after the date on which the Bids are opened and, for such sixty (60) day period, all such Bids shall be in full force and effect. Any Bid may be withdrawn prior to the scheduled closing time for the receipt of Bids but no Bidder shall withdraw a Bid within the sixty (60) day period after opening of the Bids. All bid security of unsuccessful bidders will be returned by the Owner upon selection of the successful Bidder and execution of the Agreement, and provision of the required Performance Bond and Payment Bond. In the event that the total amount of the contract awarded to the successful Contractor is $300,000 or more, the successful Contractor must be qualified under either Ind. Code 4-13.6-4 or Ind. Code 8-23- 10 before doing any work on the Project. A Performance Bond and Payment Bond with good and sufficient surety, acceptable to the Owner and Architect/Engineer, shall be required in an amount equal to one hundred percent (100%) of the Contract Price, conditioned upon the faithful performance of the Agreement. The surety of the Bonds may not be released until one (1) year after the Owner's final settlement with the Contractor. Retainage will be as required by Ind. Code 36-1-12 et seq. Owner reserves the right to (1) cancel this solicitation pursuant to Ind. Code 5-22-18-2 and/or (2) reject any offers, in whole or in part as specified in the solicitation when Owner determines in accordance with applicable Indiana laws including but not limited to Ind. Code 36-1-12-4, that such action is in the best interests of the Owner. Owner reserves the right to delay the opening of the Bids pursuant to Ind. Code 36-1-12-4. To the extent permitted by applicable law, the Owner reserves the right to waive any of the terms, conditions or provisions contained in this Notice to Bidders or the Bid Documents or any informality, irregularity or omission in the bid process or in any Bid which waiver is deemed in the Owner's discretion to be to the advantage of the Owner and which does not afford any Bidder a material competitive advantage over other Bidders. Except as specifically otherwise provided herein and as allowed by applicable Indiana law, a contract for the Project shall be awarded in accordance with this Notice to Bidders, Ind. Code 5-16-13 et seq. and Ind. Code 36-1-12 et seq., to the lowest responsible and responsive Bidder whose bid does not exceed the funds available for the Project. The Owner shall have the right to accept any Alternates in any order or combination or accept on the basis of the Base Bid alone, unless otherwise specifically provided in the Bidding Documents and to determine the lowest responsible and responsive Bidder on the basis of the sum of the Base Bid and Alternates accepted. Questions regarding this Project should be directed to Michael Krosschell by email only at krosschellm@weihe.net. Bidders shall assure that they have obtained complete sets, whether hard copy or electronic, of the Project Manual and drawings and shall assume the risk of any errors or omissions in Bids prepared in reliance on incomplete sets. Bidding documents may be purchased per the options and pricing listed on the Order page (plus Processing/ECO fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required before printing purchases. If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering and are posted on the Shipping Information tab. |
||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |