Similar Projects
(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Asbestos Window Removal at Washington Junior High School
Alteration
Post-Bid
$80,000 est. value
Naperville, IL 60540

Asbestos Abatement
Alteration
Results
Elmhurst, IL 60126

Asbestos Abatement, Fischer Elementary School
Alteration
Results
Elmhurst, IL 60126

2022 Water Treatment Plant Waste Lime Sludge Removal Project
Infrastructure
Post-Bid
$2,097,120 CJ est. value
West Chicago, IL 60185

Asbestos Abatement
Alteration
Results
Elmhurst, IL 60126

Trip Hazard Removal Program
Term Contract
Post-Bid
Naperville, IL 60540

Asbestos Abatement at Winfield Primary School
Alteration
Results
Warrenville, IL 60555

Central Business District Brick Paver Maintenance
Term Contract
Post-Bid
Naperville, IL 60540

Asbestos Abatement/Gymnasium Flooring at Winfield Central School
Alteration
Results
Winfield, IL 60190

Glenbard Township High School District 87: 2022 Capital Improvements
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Glen Ellyn, IL 60137

Asbestos Flooring Abatement
Alteration
Results
Downers Grove, IL 60515

Asbestos Abatement Project - 2023 Fieldhouse Resurfacing at Glenbard North and Glenbard West High Schools
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Carol Stream, IL 60188

Spring Road Tributary Proposed Restoration Improvement
Alteration
Results
$350,000 est. value
Oakbrook Terrace, IL 60181

Asbestos Abatement Project for the 2023 Summer Renovation Work
Term Contract, Infrastructure
Post-Bid
$80,000 CJ est. value
Itasca, IL 60143

Last Updated 05/24/2023 11:52 AM
Project Title

2023 Asbestos Abatement Work at Henry Puffer Elementary School

Physical Address View project details and contacts
City, State (County) Downers Grove, IL 60515   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Agency's Affiliate - 02/14/23
Owner View project details and contacts
Architect View project details and contacts
Description

Bid security in the form of a Bid Bond, certified check or cashier's check made payable to Downers Grove Grade School District #58 in an amount equal to not less than ten percent (10%) of the base bid amount shall be submitted with the bid. Bid security is required of all parties submitting a bid. The successful bidder shall, upon acceptance of their bid, be required to procure and pay for a Labor and Material Bond, and Performance Bond in an amount equal to one hundred percent (100%) of the bid. Bonds shall comply with all laws of the State of Illinois governing public contracts let by governmental units. In accordance with the Prevailing Wage Act, all bidders shall guarantee that not less than the prevailing wage will be paid to laborers, workers and mechanics performing work under the contract. The Board reserves the right to reject any and all bids, to negotiate contract terms with various bidders, and to waive all formalities or irregularities to any bid when such is deemed by the Board to be in the Boards best interests. Any questions regarding access to the documents shall be directed to Dr. Sonali Patil, Manager of Business Services, spatil@dg58.org. Any questions regarding the project or bidding requirements shall be directed to TEM Environmental, Inc. representative Steve Geneser via email: sgeneser@tem-inc.com prior to 5:00 P.M. on February 23rd, 2023. Henry Puffer Elementary School - 2220 Haddow Avenue Downers Grove, Illinois 60515 Asbestos Abatement at Henry Puffer Elementary School. The Work consists of flooring replacement, new casework, and painting at Henry Puffer Elementary School. Alternate No. 1 - Henry Puffer Elementary School 1. Alternate 1 includes the cost to complete full containment removal and disposal of two layers of carpet and asbestos containing floor tile and mastic using mechanical means from Rooms 209, 211, 216, 305 and 306.Include cost to provide and install Masonite in corridors of Alternate 1 areas. Alternate No. 2 - Henry Puffer Elementary School 2. Alternate 2 includes the remove and dispose of upper shelving/casework as indicated on Drawing ENV-01 in the base bid work areas (Room 213, 215, 218, 220 and 222). Alternate No. 3 - Henry Puffer Elementary School 3. Alternate 3 includes the remove and dispose of upper shelving/casework as indicated on Drawing ENV-01 in Alternate 1 work areas (Room 216 and 306) * Any questions regarding access to the documents shall be directed to Dr. Sonali Patil, Manager of Business Services, spatil@dg58.org. Any questions regarding the project or bidding requirements shall be directed to TEM Environmental, Inc. representative Steve Geneser via email: sgeneser@teminc.com prior to 5:00 P.M. on February 23rd, 2023. Questions must be received in writing, or via email (atiberi@wightco.com), until 12:00 p.m. Thursday February 23, 2023. Henry Puffer Elementary School - Start date June 12, 2023 ; End date - July 1, 2023

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents