Similar Projects
Navarre Beach Waste Valve Replacement
Alteration
Bidding
Navarre, FL 32566

Southwest Water Treatment Plant Production Well 3 Construction and Testing
Infrastructure
Bidding
FL

Irrigation Well Replacement
Term Contract
Post-Bid
Land O' Lakes, FL 34639

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

DX38 Dynamometer Pump and Motor Replacement Coast Guard Engineering
Results
$45,000 est. value
Miami Beach, FL 33139

Southwest Wellfield Project, Phase 1; West Polk Lower Floridan Aquifer Project Phase 1; Construction Manager At Risk, Polk Regional Water Cooperative
Infrastructure, Alteration
Bidding
$462,000,000 est. value
Winter Haven, FL

Progressive Cavity Pump - Sludge Feed Pump
Post-Bid
Port Saint Lucie, FL

Mechanical Integrity Testing of the SRPF, WTP 11, and SROC Deep Injection Well Projects
Results
$145,000 est. value
Belle Glade, Boca Raton, Delray Beach, FL

Water Supply Well Rehabilitation
Infrastructure
Bidding
Coral Springs, FL

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Post-Bid
FL

G-310/G-335 950 CFS Pump Overhaul Project
Results
$2,660,000 to $2,940,000 est. value
West Palm Beach, FL

Pumping Services (Scheduled/Unscheduled)
Infrastructure
Bidding
$400,000 est. value
Fort Lauderdale, FL

Well Boring and Drilling
Post-Bid
Tampa, FL

Pump Rehabilitation and Repair
Results
Cape Coral, FL 33915

Last Updated 04/08/2022 05:00 AM
Project Title

Supply and Deliver Simflo Vertical Turbine Pump

Physical Address View project details and contacts
City, State (County) Tarpon Springs, FL   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To supply all materials, parts, and equipment to furnish and deliver one (1) SIMFLO model SP11H single stage vertical turbine pump (Pump), pursuant to the specifications contained herein

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents