Similar Projects
HVAC Renovation
Alteration
Bidding
Albany, MO 64402

Hickman High Penthouse Chiller Replacement
Infrastructure
Bidding
Columbia, MO 65203

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Virginia Avenue Housing Complex, Heat Pump Replacements
Results
$85,500 to $95,000 est. value
Columbia, MO 65201

Cypress Swamp HVAC Replacement 2021
Results
Saint Louis, MO

Installation of Air-Conditioning and Heating Units
Alteration
Bidding
Hopkins, MO

Timberland HS Rooftop Unit
Post-Bid
Wentzville, MO 63385

Kitchen Hoods Inspection and Cleaning
Results
Columbia, MO 65202

Climate Control Equipment for The Gymnasium, Portions of High School Building, and Portions of Elementary Building
Alteration
Bidding
Half Way, Halfway, MO 65663

2021-2022 Preventative Maintenance for HVAC
Post-Bid
Rolla, MO

Ward Edwards NOC Cooling System Replacement Project
Results
Warrensburg, MO

Carshield Field HVAC Replacement
Alteration
Bidding
O Fallon, O'Fallon, MO 63366

HVAC Services (City-Wide)
Term Contract, Alteration
Post-Bid
Springfield, MO

Fresh-Aire UV Air Purifiers and Replacement Lamps
Alteration
Results
MO

Last Updated 07/14/2021 12:44 PM
Project Title

Conservation Commission Headquarters Commission Meeting Room HVAC Replacement

Physical Address View project details and contacts
City, State (County) Jefferson City, MO   (Cole County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000 to $30,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to: mobilization and demobilization, shut power and water off to heat pump, disconnect all electrical and piping to heat pump, remove heat pump HP-D5 and leave in attic space, furnish new heat pump (Carrier 50 PTH036-E6 or similar), unit to be a 2-stage unit with hot gas reheat for humidity control, 480V, 3 ph, 60 Hz, bring new heat pump up through ceiling and set in same location as existing unit, pipe condensate and loop water lines to new heat pump, wire high voltage power up to new unit and change breaker to heat pump manufacturers size, connect new unit to existing ductwork with transition as required, perform start up on unit, have Koch Air replace existing thermostat with unit that senses temperature, humidity and CO2 with an unoccupied override and setpoint adjustment. This will require reprograming of the existing I-Vu DDC controls system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents