Similar Projects
JMB Beechcroft Townhomes
New Construction
Conception
Spring Hill, TN

Kingsley Place
New Construction, Infrastructure - 68,871 SF
Conception
$200,000,000 CJ est. value
Spring Hill, TN 37174

Gerber Collision / Spring Hill
Addition, Infrastructure - 2,916 SF
Design
$800,000 CJ est. value
Spring Hill, TN 37174

Gerber Collision / Spring Hill
Addition, Infrastructure - 2,916 SF
Design
$800,000 CJ est. value
Spring Hill, TN 37174

Dutch Bros Coffee / Columbia
New Construction, Infrastructure - 950 SF
Bidding
$285,000 CJ est. value
Columbia, TN 38401

Beechcroft Road Water System Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Spring Hill, TN 37174

Cheatham Stoplog Concrete Storage Slab
Term Contract, Infrastructure, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value

South Garden Street Streetscape
Infrastructure
Post-Bid
Columbia, TN 38401

State Aid Paving Project - Hayes Denton Road
Infrastructure
Results
Columbia, TN

Grading, Drainage, Lighting and Paving
Infrastructure
Results
TN

Hunter's Point Section 7 Housing Development
New Construction
Pending Verification
Spring Hill, TN 37174

Bear Creek Glen Townhomes
New Construction
Pending Verification
Columbia, TN 38401

New High School - Maury County School District
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Columbia, TN 38401

Arbor Valley Residences
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Spring Hill, TN 37174

Highway - 2022 Asphalt
Term Contract, Infrastructure
Post-Bid
Columbia, TN

Last Updated 12/07/2022 06:41 PM
Project Title

Mountain View Subdivision Phase 1

Physical Address View project details and contacts
City, State (County) Spring Hill, TN 37174   (Maury County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $17,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of nine buildings on 17.51 acres. Scope details have not been released. As of December 7, 2022 the project is in planning stage. and seeking final plat approval from the City of Spring Hill Planning Commission approved a final plat on August 8, 2022. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents