Similar Projects
SR 52 / US 82 at Little River and Overflow - Bridge Rehab
Infrastructure
Design
$1,000,000 CJ est. value
Tifton, GA 31793

SR 52 / US 82 at Little River and Overflow - Bridge Rehab
Infrastructure
Design
$1,000,000 CJ est. value
Tifton, GA 31793

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Commerce Way Streetscape Improvements
Infrastructure
Post-Bid
$2,000,000 est. value
Tifton, GA 31794

Agriculture Meter Installation
Infrastructure
Results

South Parking Lot Improvements
Infrastructure
Results
$500,000 est. value
Tifton, GA

FY2022 LMIG Waterline Replacements
Infrastructure
Post-Bid
$300,000 est. value
Tifton, GA

6.700 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 520 Beginning West of the Worth County Line and Extending East of Salem Church Road
Infrastructure
Results
Tifton, GA 31793

RFQ Contractor - USDA ARS Laboratory at Tifton
New Construction, Infrastructure - 46,008 SF
Post-Bid
$100,000,000 CJ est. value
Tifton, GA 31793

Main Lane Improvements
Infrastructure
Results
$175,000 est. value
Tifton, GA

Len Lastinger Elementary School Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Tifton, GA 31794

FY2021 TSPLOST Resurfacing Project
Infrastructure
Results
$900,000 est. value
Tifton, GA

Adams Road Culvert Improvements
Infrastructure
Post-Bid
$80,000 CJ est. value
Tifton, GA 31733

Last Updated 12/01/2022 06:35 PM
Project Title

Water, Sewer and Street & Drainage Improvements to serve the West Phillipsburg Community

Physical Address View project details and contacts
City, State (County) Tifton, GA 31794   (Tift County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $6,719,579 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Any Contractor submitting a bid must be a pre-qualified Georgia Department of Transportation Contractor. All utility work performed under this contract must be performed by a licensed Utility Contractor by the State of Georgia. Both license numbers must be written on the face of the bid envelope. No bid will be opened unless the license number is clearly shown. See Instructions to Bidders for additional bidding requirements. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed West Phillipsburg Community Project as shown on the construction drawings. In general, construction consists of the construction of +/- 4,000 linear feet of twenty foot wide urban roadway including curb and gutter, storm drainage pipe and boxes, box culverts, concrete ditch paving, base and asphalt, +/- 4,000 of 8-inch PVC water main replacement with the transfer of existing water services, fire hydrants, etc., the replacement of +/- 1,500 linear feet of 8-inch sanitary sewer replacement, +/- 3,000 linear feet of 18-inch sanitary sewer main replacement with associated transfer of existing sewer services and all associated measures for the complete project as shown in the construction drawings. This work will be awarded in one (1) contract with a 365 consecutive calendar day construction schedule. The Owner, reserves the right to reject any or all bids, to waive informalities, and to re-advertise.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents