Similar Projects
Watertower Place
Renovation - 250,000 SF
Conception
Pueblo, CO

Avon Hotel
New Construction - 101,405 SF
Conception
$10,000,000 CJ est. value
Avon, CO 81620

Clear Creek Crossing - Master Plan
New Construction
Design
Wheat Ridge, CO

Kimpton Hotel
New Construction - 150,000 SF
Design
Denver, CO 80237

Candlewood Suites - Westgate at Powers
New Construction - 56,572 SF
Bidding
$5,000,000 to $10,000,000 CJ est. value
Colorado Springs, CO 80916

Steamboat Grand Piping Distribution System Replacement
Renovation, Alteration
Post-Bid
$3,500,000 est. value
Steamboat Springs, CO 80487

Avon Hotel - Springhill Suites and Townplace Suites
New Construction - 131,450 SF
Post-Bid
Vail, CO 81657

Design Build Services for Hotel Development
Results
Montrose, CO 81401

Kinship Landing
New Construction - 24,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Colorado Springs, CO 80903

Vib Hotel
New Construction - 182,000 SF
Construction
$10,000,000 est. value
Denver, CO

Hyatt Place
New Construction
Pending Verification
Colorado Springs, CO 80920

Atari Hotel
New Construction
Pending Verification
Denver, CO

Empower Field at Mile High
New Construction - 3,500,000 SF
Conception
$10,000,000 CJ est. value
Denver, CO

Gold Lake Mountain Resort
New Construction, Renovation, Demolition
Design
Ward, CO 80481

Lone Tree Golf Club and Hotel Improvements
Renovation, Infrastructure
Post-Bid
$1,400,000 to $1,500,000 est. value
Lone Tree, CO 80124

Last Updated 01/25/2022 04:24 PM
Project Title

Best Western Plus Executive Residency Fillmore Inn

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80907   (El Paso County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced September 2021, Construction Completion Expected second quarter 2022
Bids Due View project details and contacts
Estimated Value $6,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Hotel/Motel, 4 Stories Above Grade, New Construction, 60 Unit(s).
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents