Similar Projects
Animal Services Driveway Replacement
Infrastructure
Bidding
$80,000 est. value
Winter Haven, FL 33880

Construction Services for Master Project Improvements Phase 4
Post-Bid
FL

Waverly Park Playground Installation
Post-Bid
Lake Wales, FL

Design Build Services - Sertoma Park Baseball Field Renovations
Results
Winter Haven, FL

Sidewalk Extension
Results
$65,474 est. value
Lake Alfred, FL 33850

Lake Pierce Ranchettes Park Playground Installation
Post-Bid
Lake Wales, FL 33898

Sidewalk/Drainage Improvements (BDI)
Results
Less than $512,015 est. value
FL

ADA Ramp Construction
Post-Bid
Lakeland, FL 33805

Sidewalk/Milling and Resurfacing/Pedestrian Traffic Signals
Results
Less than $2,485,336 est. value
Lakeland, FL 33813

Cascades Phase 2 Improvements
Post-Bid
Haines City, FL

Misc. Concrete Repair
Results
$159,240 est. value
FL

Accessible Recreation Equipment, Surfacing and Benches
New Construction
Post-Bid
$53,425 est. value
Eagle Lake, FL

Bone Valley ATV Park Expansion
Results
$519,898 est. value
Fort Meade, FL 33841

ADA Compliant Entrances at Three City Buildings
Alteration
Post-Bid
Fort Meade, FL 33841

Construction of the Lake Myrtle Park Competitive Ski Lake
New Construction
Results
Auburndale, FL 33823

Last Updated 05/27/2022 01:31 AM
Project Title

Mosaic Soccer Fields and Grassed Parking

Physical Address View project details and contacts
City, State (County) Bartow, FL 33830   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor will protect the existing utilities on the site while excavating the grass, removing existing sidewalks and other associated demolition. This project shall also include construction of associated drainage, sodding, fencing, sidewalks and paving to construct the proposed soccer fields and grassed parking. All excess fill, construction and demolition debris shall be disposed of by the Contractor.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents