Similar Projects
E&P Project 2019-10035 Mulberry and Agg Drainage Improvements
Infrastructure
Bidding
Tomball, TX 77375

Drainage Improvements Along Louetta Road from Spring Cypress to Senger Gully (Bonfire)
Infrastructure
Bidding
Houston, TX 77282

Drainage Facilities to Serve City Gate Detention Phase 2
Post-Bid
TX

South Main Street Drainage Improvements from West Texas Avenue to West Gulf Avenue
Post-Bid
Baytown, TX 77520

1L Phase Two Regional Detention/Mitigation to Serve Towne Lake
Results
TX

HPW-FY2020 Drainage Rehabilitation (SWAT) Work Orders No. 3
Results
$4,000,000 est. value
TX

2019 Hurricane Harvey Erosion Repairs on Va1, Va9, and Va12
Infrastructure
Bidding
Katy, TX

Water Distribution, Sanitary Sewer, Drainage, and Flood Mitigation to Serve Forest Village Section 12
Post-Bid
Spring, TX 77386

Concrete Culverts and High-Density Materials
Results
Houston, TX

Cynthia Street Paving and Drainage Improvements - 2015 CDBG-DR
Infrastructure
Bidding
Bellaire, TX 77402

Flood Mitigation Work at Historic Oaks Allen Parkway Village
Post-Bid
Houston, TX 77019

Drainage and Paving Facilities for City Gate Orem Drive Street Dedication
Results
Less than $477,146 est. value
Houston, TX

Construction of Water, Drainage, and Paving Facilities for East Orem Drive Roadway Improvement and Extension
Infrastructure
Bidding
Houston, TX 77282

Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Katy Lakes Section 5
Post-Bid
TX

White Oak Bayou Harvey Repairs in Harris County, Texas
Results
$1,000,000 to $5,000,000 est. value
Houston, TX 77022

Last Updated 08/05/2021 04:19 AM
Project Title

Elyson Phase 5A Overflow Mitigation and Detention Basins

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Project: 1. Site Preparation, Detention Pond/Channel Excavation, on-site spoil disposal, drainage swales, (5) junction boxes, (5) headwall with flared wings, box culverts, and outfall 2. 571,898 CY of Detention Basin/Channel Excavation, and Spoil Disposal 3. 20,421 LF of Backslope Interceptor Swale, and 62 Backslope Interceptor Structures 4. 4,600 LF of Concrete Pilot Channel. 5. 1,180 SY Concrete Slope Paving and 427 SY Concrete Rip-Rap 6. 5,052 LF of 18-inch through 60-inch RCP trenchless/open cut construction and all appurtenances 7. 1,250 LF of 6'x4' and 10'x4' RCB and all appurtenances 8. Stormwater Pollution Control. Microsoft Teams Meeting Bid Opening Call-In Number: (832) 680-2579 Conference ID: 470 291 988#

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents