Similar Projects
Water Meter Replacement
Infrastructure
Design
$83,850 CJ est. value
Porterdale, GA 30014

Lanier Filter Plant Chemical Addition and Sampling Improvements
Renovation
Bidding
$250,000 CJ est. value
Buford, GA 30518

Elevated Water Storage Tank Rehabilitation
Infrastructure
Bidding
$315,000 CJ est. value
Norman Park, GA 31771

Buford Southside Water Pollution Control Plant (WPCP) Filter Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Buford, GA 30518

Selective Improvements at Four Developments
Alteration
Post-Bid
$350,000 est. value
Metter, GA

Plumbing Service and Repair for Fire Department
Alteration
Post-Bid
Augusta, GA

Purchase Bottle Filler Station and ADA Cooler
Alteration
Results
Marietta, GA

Hot Water Renovation Project for Heritage High School
Alteration
Results
$412,000 est. value
Conyers, GA 30094

Cowan's Lake Raw Water Pump Station Improvements
Renovation
Pending Verification
$86,000 CJ est. value
Villa Rica, GA 30180

Water Distribution System Improvements Phase I
Infrastructure
Bidding
$1,100,000 CJ est. value
Hoschton, GA 30548

On-Call Plumbing Services
Term Contract
Post-Bid
Roswell, GA

Standby Plumbing Repair Services
Alteration
Results
GA

KSU - Plumbing Maintenance, Repair, and Installation Services
Alteration
Post-Bid
Kennesaw, GA

Construction Management at Risk services for Fannin County High School Plumbing, Fannin County Middle School HVAC
Alteration
Results
Blue Ridge, GA 30513

Plumbing Services 2021
Alteration
Post-Bid
Warner Robins, GA

Last Updated 01/31/2023 03:57 PM
Project Title

Hamilton Road Water and Sewer Relocation

Physical Address View project details and contacts
City, State (County) Lagrange, GA 30241   (Troup County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists the installation of water and gravity sewer and appurtenances along the Hamilton Road (US 27) corridor beginning at the intersection of Hamilton Road (US 27) and Auburn Street and ending at Hamilton Road (US 27) and US 219/Whitesville Street/Morgan Street. Questions and other inquiries shall be submitted to the Issuing office, Attention: Morgan Bell, Morgan.Bell@bargedesign.com. The water main work includes furnishing labor and materials necessary for installing a new water main and relocated and connected water meters, new fire hydrants and valves, along with all erosion and sedimentation control measures. The water main relocation work will include approximately 3,750 linear feet of 2-inch high density polyethylene pipe; 1,160 linear feet of 6- inch ductile iron pipe, 62 linear feet of 8-inch ductile iron pipe, 996 linear feet of 10-inch ductile iron pipe, and 8,394 linear feet of 16-inch ductile iron pipe; 360 linear feet of 12-inch casing installed via jack and bore and open cut, 100 linear feet of 18-inch steel casing installed via jack and bore and open cut, 920 linear feet of 24-inch steel casing installed via jack and bore and open cut; valves, fire hydrants, and other related appurtenances. The gravity sewer work includes furnishing labor and materials necessary for installing relocated sewer main, manholes and lateral connections throughout the corridor. The sewer relocation work will include 8,379 linear feet of 8-inch polyvinyl chloride (PVC) pipe, 1,291 linear feet of 8-inch PVC PS115 pipe, 49 4-foot diameter sanitary sewer manholes, 12 5-foot diameter sanitary sewer manholes, 1 6-foot diameter sanitary sewer manhole, 14 4-foot doghouse manholes, 1 5-foot doghouse manhole, 180 linear feet of 8-inch steel casing installed via jack and bore, 900 linear feet of 16-inch steel casing installed via jack and bore and open cut, 1,107 linear feet of sewer laterals, along with the abandonment of existing sanitary sewer manholes and sewer mains. Each Bid must be accompanied by a Bid Bond, prepared on the form of Bid Bond attached to the Contract Documents, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed as a certified company in the latest issue of U.S. Treasury Circular 570, in the amount of five percent of the Bid. The Owner will make payments, within 45 days, in response to the Contractors monthly Applications for Payment, which are accompanied by the Engineers Certificate for Payment, for work performed to date plus cost of stored materials, less retainage. Payments, Applications for Payment, Certificates for Payment, and retainage shall be in accordance with the provisions of the Contract Documents. No bid may be withdrawn within 60 calendar days after the scheduled time for receipt of bids. All bidders must have a Georgia Utility Contractor License and shall comply with all requirements of the State of Georgia. The Owner will in no way be liable for any costs incurred by any bidder in the preparation of its Bid in response to this Invitation to Bid. The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and Payment Bond each in the amount of 100 percent of the Bid. The Owner reserves the right to reject all Bids, to waive informalities and to readvertise.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents