Similar Projects
Billfish Air Conditioning
New Construction, Build-Out
Conception
Palm City, FL 34990

Billfish Air Conditioning
New Construction, Build-Out
Conception
Palm City, FL 34990

The Altis
New Construction, Infrastructure - 10,000 SF
Design
$2,700,000 CJ est. value
Hobe Sound, FL 33455

The Altis
New Construction, Infrastructure - 10,000 SF
Design
$2,700,000 CJ est. value
Hobe Sound, FL 33455

Monster Car Wash / Stuart
Demolition, New Construction, Infrastructure - 4,300 SF
Bidding
$1,000,000 CJ est. value
Stuart, FL 34997

Martin Downs Water Repump Station Improvements
Renovation, Infrastructure
Bidding
$1,800,000 CJ est. value
Stuart, FL 34994

Kanner Highway Mixed Use - Master Plan
New Construction - 373,251 SF
Post-Bid
$10,000,000 CJ est. value
Stuart, FL 34994

Savannah Industrial Park - Lots 4 and 5
New Construction - 15,355 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Jensen Beach, FL 34957

Y--BLM-ES-ONA Boardwalk Repairs
Alteration
Results
$25,000 est. value
Hobe Sound, Jupiter, FL 33469

Directional Drilling Services for South Martin Regional Utility
Infrastructure
Results
Hobe Sound, FL

Kogan and DiSalvo Law Office
New Construction - 3,950 SF
Construction
$1,420,000 est. value
Stuart, FL 34997

South Martin Industrial Park - Kansas West
New Construction - 96,231 SF
Construction
$12,000,000 est. value
Stuart, FL 34997

Meridian Marina
Renovation, Addition - 62,000 SF
Pending Verification
Palm City, FL 34990

Karis Cold Storage
New Construction - 309,690 SF
Pending Verification
$10,000,000 CJ est. value
Stuart, FL 34997

Ferreira Marine Way
New Construction - 29,050 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Stuart, FL 34997

Last Updated 01/06/2023 12:05 PM
Project Title

Willis Custom Yachts Expansion

Physical Address View project details and contacts
City, State (County) Stuart, FL 34997   (Martin County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Dock/Pier/Marine, Food/Beverage Service, Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $38,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 consists of the new construction of a 19,800-square-foot boat maintenance land canopy, a 13,744-square-foot boat maintenance water canopy, a 102,972-square-foot boat manufacturing building, a 42,050-square-foot boat service building and a 2,050-square-foot restaurant at 6800 SW Jack James Drive in Stuart. Phase 2 includes the new construction of a 10,000-square-foot marina office building, a 102,972-square-foot boat manufacturing building, a 97,000-square-foot boat maintenance water canopy and 22 boat slips at 1330 SW Swallowtail Way in Palm City. As of January 6, 2023 the project is in design stage. The Martin County Local Planning Agency approved a revised major master phasing and final site plan on December 1, 2022. The architect has been chosen. Information regarding the general contractor and method of selection has not been disclosed. A construction timeline has not been determined, but may begin in the summer of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 260,044 SF - 1 Story Above Grade, 205,944 SF. 1 Story Above Grade, 10,000 SF. 1 Story Above Grade, 2,050 SF. 1 Story Above Grade, 42,050 SF. Parking Spaces, 22 Parking Spaces.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents