Similar Projects
Parking Lot Accessibility Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Maryville, MO 64468

Parking Lot Accessibility Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Maryville, MO 64468

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

2021 Asphalt Overlay Program
Results
Tarkio, MO

South Main Corridor Improvement
Infrastructure
Results
Maryville, MO

Gould Peterson Municipal Airport, Construct 48'x35' Storage Hangar and Approach
New Construction, Infrastructure - 1,680 SF
Bidding
$1,500,000 CJ est. value
Tarkio, MO 64491

Repair Gravel Roadway Surfaces - Disaster 4435
Infrastructure
Post-Bid
Less than $1,097,717 est. value
Craig, MO

Holt 190 Road Work
Infrastructure
Results
MO

Repair Gravel Roadways - Disaster 4451
Infrastructure
Post-Bid
Less than $323,868 est. value
Craig, MO

South Main Reconstruction, South Avenue to Highway V
Infrastructure
Results
Maryville, MO 64468

150 Two Span Pre-stressed I Girder Bridge and Roadway
New Construction, Infrastructure
Post-Bid
MO

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Resurface
Infrastructure
Results
$5,000,000 to $7,500,000 est. value

Last Updated 08/08/2022 08:40 AM
Project Title

Pavement Resurfacing

Physical Address View project details and contacts
City, State (County) Forest City, MO 64451   (Holt County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $9,945,264 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job JNW0091 Route VARIOUS ATCHISON, GENTRY, HOLT, NODAWAY County. Pavement resurfacing on Routes T, DD, BB, H and HH in Holt County, Routes EE, CC, Z, and KK in Atchison County, Route PP in Nodaway County and Route M in Gentry and Nodaway Counties, the total length of improvement being 76.4 miles. Range: $5M to $7.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - A02 - Pavement Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents