Similar Projects
Last Updated | 04/28/2023 05:15 PM |
Project Title | Install Medium Intensity Runway Lighting (LED) and Install Papi Systems Searcy Municipal Airport |
Physical Address | View project details and contacts |
City, State (County) | Searcy, AR 72143 (White County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $566,908 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Install Medium Intensity Runway Lighting and Install 4-box Papi System at Searcy Municipal Airport Guarantee will be required with each bid as follows: A certified check on a solvent bank or a bid bond in the amount of five (5) percent of the total amount of bid, made payable to the Searcy Airport Commission. In accordance with Act 150 of 1965, as amended, all bidders shall conform to the requirements of the Arkansas State Licensing Law for Contractors. The Contractor will be required to comply with the Davis-Bacon Requirements regarding wage and labor (2 CFS 200 Appendix II (D)) and pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor. A copy of the wage rates are contained in the Specifications. The proposed contract is subject to the Buy American Preference contained in 49 USC 50101. Details of such requirements are contained in the Specifications. The proposed contract is subject to the Trade Restriction Clause contained in 49 CFR Part 30. Details of such requirements are contained in the Specifications. The Contractor must certify at the time of bid submission that neither it nor its principals are presently debarred or suspended by and Federal department or agency from participation in this transaction as defined by Title 2 CFR Part 180. The Contractor must comply with Government-Wide Requirements for Drug-free Workplace. It is the policy of the Department of Transportation that Disadvantaged |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |