Similar Projects
Somers Sanitation Transfer/Recycling Facility Improvements
New Construction
Design
Somers, NY 10589

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Throgs Neck WWTP Reconstruction and Improvements
New Construction
Bidding
$42,274,750 to $57,195,250 est. value
Bronx, NY 10451

Wastewater Treatment Facility Improvements
Renovation
Bidding
Franklinville, NY

Z--Renovate Sewage Treatment Plant Trickling Filter at Castle Point
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Wappingers Falls, NY 12590

Screening and Grit Transport Equipment Improvements, Polymer Equipment Upgrades and Dewatering Equipment Control Upgrades
Post-Bid
Niagara Falls, NY 14304

Wastewater Treatment Plant Upgrades
Results
Morrisville, NY

Cellular Bulkhead Rehabilitation-Phase III and Phase IV Yonkers Joint Wastewater Treatment Plant
Results
$7,200,000 to $8,200,000 est. value
Yonkers, NY 10700

Woodhull Waste Water Treatment Facility
Construction
Woodhull, NY 14898

Wastewater Treatment Plant Screen Upgrade
Construction
Catskill, NY 12414

Rogers Multifamily Residential
New Construction
Pending Verification
Westhampton Beach, NY 11978

Wastewater Treatment Plant Improvements Project
Renovation
Bidding
$100,000 to $3,700,000 est. value
Sherman, NY

Replace Wastewater Treatment Plant at Highland RC
Post-Bid
$3,325,000 to $4,650,000 est. value
Highland, NY 12528

Construction of Phase II Digester Improvement
Results
Syracuse, NY 13202

WWTP Upgrade
Construction
Oneonta, NY 13820

Last Updated 10/18/2021 08:20 AM
Project Title

Wastewater Treatment Facility Improvements

Physical Address View project details and contacts
City, State (County) Corning, NY   (Steuben County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract A: UV Disinfection System involves the general construction of new treatment components including a new UV Disinfection unit and the replacement of the plant effluent pumps and controls. The work also includes sitework including piping modifications and expansion, surface restoration, etc. The electrical construction consists of all electrical power connections including the installation of electric conduit, panels, disconnects and wiring for all new process equipment, and lighting systems serving the new treatment components. Separate bids for the General Construction and Electrical Construction will be taken on Contract A. Contract B: Chemical Storage Building involves the general construction of new treatment components including a new chemical feed system. The work also includes sitework including piping modifications and expansion, surface restoration, etc. The electrical construction consists of all electrical power connections including the installation of electric conduit, panels, disconnects and wiring for all new process equipment, and lighting systems serving the new treatment components. Separate bids for the General Construction and Electrical Construction will be taken on Contract B.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents