Similar Projects
Longwood/Poquito Bayou Park Dock Extension
Post-Bid
Shalimar, FL 32579

Macdill AFB Marina Wet Slip Repair
Post-Bid
Macdill AFB, FL

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

Lignumvitae Key Botanical State Park - Repair and Renovate Dock
Results
Islamorada, FL 33036

Tribute by Marriott
New Construction
Construction
$12,000,000 est. value
Saint Augustine, FL 32080

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

MRD - 12Nov2020 - Installation of Waterways Signs, Lights and Pilings
Post-Bid
FL

F--Debris Removal from FlL Bay and Ever
Results
Everglades, FL

Mayport Docks Redevelopment Project
Post-Bid
Jacksonville, FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Results
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

Buoy Maintenance Agreement
Term Contract
Results
Tallahassee, FL 32301

Design-Build Floating Day Dock and Dinghy Dock
Post-Bid
Bradenton Beach, FL 34217

Lake Echo Dock
Results
Lake Alfred, FL 33850

Martin County Bs/Mpz Marker Construction Project
Post-Bid
Jensen Beach, Stuart, FL

Last Updated 10/28/2021 02:49 PM
Project Title

Bouy Pin Installation

Physical Address View project details and contacts
City, State (County) Key West, FL 33040   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The National Oceanic Atmospheric Administration (NOAA), National Ocean Service (NOS), Office of National Marine Sanctuaries (ONMS), Florida Keys National Marine Sanctuary (FKNMS) requires repair and proactive replacement of pin hardware for 56 buoys within Florida Keys National Marine Sanctuary (FKNMS) to include purchase of all hardware needed to complete installation of buoys except for the following: FKNMS will be providing shackle, bottom downline and floats for 10 deeper water sites and small marker floats and lines for all new pins.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents