Similar Projects
Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Mechanical Integrity Testing for Deep Injection Wells
Results
Miramar, FL 33027

Installation of Irrigation Pump System
Results
Miramar, FL 33025

Maintenance, Repair and Parts for Tradewinds Brand Pumpset
Term Contract
Post-Bid
Davie, FL

Access Structure and Wetwell Rehabilitation - Term Contract
Term Contract
Results
Plantation, FL

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Post-Bid
FL

Supply and Delivery of Well Pump
Results
Plantation, FL 33317

Raw Water Well #9
Results
Hallandale, FL 33009

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
Less than $175,000 est. value
Fort Lauderdale, FL 33301

Irrigation Pump Control Upgrade to VFD
Results
Weston, FL

Pool Pumps
Results
Lauderhill, FL 33311

Reverse Osmosis Membrane Feed Pump and Motor
Results
Less than $275,000 est. value
Davie, FL 33314

Peele-Dixie Water Treatment Plant Injection Well Mechanical Integrity Test
Results
Fort Lauderdale, FL 33317

Purchase of a Grundfos Submersible Pump
Results
Davie, FL

Last Updated 07/21/2021 08:39 AM
Project Title

Well Water Pump and Motor Combination

Physical Address View project details and contacts
City, State (County) Miramar, FL 33027   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish and deliver a New “10 x 14 2 Stages VST Pump and Motor Combination” for a groundwater (Biscayne Aquifer) well servicing our Water Treatment Plant

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents