Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Intersect Modif
Infrastructure
Design
$8,000,000 CJ est. value
El Reno, OK 73036

Freedom Trail Park Play­ground and Splash Pad
Infrastructure
Bidding
$300,000 CJ est. value
Yukon, OK 73099

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

137th Backflow Repair
Term Contract
Post-Bid
Oklahoma City, OK

Operation, Maintenance and Repair Services
Term Contract
Results
Oklahoma City, OK

Section II - 72-Inch Water Transmission Main Improvements
Infrastructure
Results
$5,467,875 est. value
Oklahoma City, OK

NW 10th @ The Stack
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Yukon, OK 73099

Eagles Glen
New Construction, Infrastructure
Pending Verification
$12,910,000 CJ est. value
Oklahoma City, OK 73099

Grade, Drain, Bridge and Surface
Infrastructure
Design
$13,000,000 CJ est. value
Yukon, OK 73099

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Waterline Replacement Northwest 4th Street and Shartel Avenue
Infrastructure
Results
Oklahoma City, OK

Grade, Drain and Surface - SH 4
Infrastructure
Design
$11,781,436 CJ est. value
Yukon, OK 73099

Forster Drive Waterline Relocation
Infrastructure
Post-Bid
$200,000 est. value
Mustang, OK 73064

Charlotte Terrace and Heights Drive Drainage Improvements
Infrastructure
Results
Mustang, OK

Last Updated 11/16/2022 05:04 PM
Project Title

Drainage Improvements for Southern Heights Addition

Physical Address View project details and contacts
City, State (County) El Reno, OK 73036   (Canadian County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $607,355 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: 2,400 LF of 10' bottom channel liner with vertical and 1 to 1 sides with other miscellaneous appurtenances. Each proposal shall be accompanied by an acceptable form of Proposal Guaranty in an amount equal to at least five percent (5%) of the amount of Proposal, as guaranty that if the : Proposal is accepted, the Bidder will execute the Contract and furnish the acceptable Performance Bond, Labor & Maintenance Bond, Owner's Protective Liability Policy, and Certificates of Insurance within fifteen (15) days after the award of the contract. The time allowed for completion of this project is 150 calendar days. Liquidated damages for | failure to complete the project within the allotted time or authorized extensions thereof, shall be $350.00 per working day. The Owner reserves the right to reject any or all bids, to waive any informality in the bidding, | for the benefit of the Owner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents