Similar Projects
SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Construction of Crystal River Town Square
Results
Less than $820,683 est. value
Crystal River, FL 34428

Asphalt Repair
Results
Less than $100,000 est. value

Resurfacing of Citrus County Road - North Citrus Springs Boulevard from US 41 to Withlacoochee Trail (CR39)
Results
Less than $1,225,000 est. value
Lecanto, FL 34461

Hill Street Reclamation
Results
Inverness, FL 34450

Asphalt Repair Experience Form
Results
Less than $500,000 est. value

Emergency Roadside Assistance Service (ERAS)
Results
Less than $204,400 est. value

Resurfacing/Bike Path/Trail/Drainage Improvements
Results
Less than $21,060,238 est. value
FL

Resurfacing of Citrus County Road - North Forest Ridge Boulevard from West Lake Beverly Drive to CR 491
Results
Less than $705,840 est. value
FL

Construction Services for The Beverly Hills West Septic Tank Phase-Out
Results
Beverly Hills, FL

Residential Road Resurfacing Project (FY 20/21)
Results
Less than $4,300,000 est. value
Lecanto, FL 34461

Sidewalk/Base Work/Milling and Resurfacing/Drainage Improvements
Results
Less than $925,000 est. value
Crystal River, FL 34428

Paving and Striping Services
Results
FL

Asphalt Repair and Maintenance
Results
Less than $100,000 est. value

Colonade Roadway Project
Infrastructure
Results
Inverness, FL

Last Updated 07/26/2021 08:15 AM
Project Title

SCOP Road Resurfacing of Citrus County CR491 from West Grover Cleveland Boulevard to West Ocala Street

Physical Address View project details and contacts
City, State (County) Lecanto, FL 34461   (Citrus County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,928,621
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide roadway milling and resurfacing services for four lanes and a middle turn lane of County Road 491 W. Grover Cleveland Blvd. to W. Ocala St., approximately 3.1 miles per lane. This includes milling 1.5”, then resurfacing with an asphalt finish course 1.5” thick, being FC 12.5 with PG 76-22 polymer binder - Traffic Level D, pursuant to the current FDOT Standard Specifications for Road and Bridge Construction, January 2021. Asphalt to be provided for the project must be identified on the current FDOT Asphalt Mix Design Plant Assignment Sheet and is to be submitted with the bid. Pavement markings and signage are to meet current MUTCD criteria. Work includes, but is not limited to, exposing and cleaning edge of existing pavement, milling, paving, temporary and permanent pavement markings, redressing, installing new R.P.M.s, shoulder grading, sodding.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents