Similar Projects
2022 Hillandale and Horton New Signal 05-1229
Infrastructure
Bidding
$200,000 est. value
Durham, NC 27705

Installation of New Traffic Signal D-0828 (Renaissance Parkway and Leonardo Drive)
Infrastructure
Bidding
$400,000 est. value
Durham, NC 27713

Blue Ridge Road Bike/Ped Improvement
Infrastructure
Post-Bid
Raleigh, NC

Milling, Paving, and Striping for Three (3) Durham County Parking Lots and Sealing and Striping for Six (6) Durham County Parking Lots
Infrastructure
Post-Bid
Durham, NC 27701

Installation of CIP Funded Traffic Signals (NCDOT Owned)
Results
$26,153,750 est. value
Durham, NC

Milling, Paving, and Striping of the Foster Street Parking Lot
Results
Less than $22,417 est. value
Durham, NC

District Beautification Project
Infrastructure
Post-Bid
Durham, NC

Traffic Control
Results

Trails Repair 2021
Results
$3,238,054 est. value
Durham, NC

Fire Station 10 Driveway and Drainage Rehabilitation
Infrastructure, Alteration
Results
$40,000 to $50,000 est. value
Durham, NC 27712

Annual Needs Signals and Loops
Term Contract, Infrastructure
Results

Installation of Traffic Signal Loops
Infrastructure
Results
$100,000 est. value
Raleigh, NC

South Ellerbe Restoration Phase 2 - Site Demolition and Mass Grading
Demolition, Infrastructure, Alteration
Results
$1,512,594 est. value
Durham, NC 27701

Signal Upgrades
Infrastructure
Results

Bragtown Sidewalk Improvements 2022
Infrastructure
Results
$1,431,150 est. value
Durham, NC

Last Updated 07/21/2022 07:37 AM
Project Title

Chapel Hill Road Transit Corridor Improvement

Physical Address View project details and contacts
City, State (County) Durham, NC 27700   (Durham County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of sidewalk, curb ramps, bus stop pads, pedestrian signals and crosswalks along the Chapel Hill Road corridor.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents