Similar Projects
New South Norwalk School
New Construction
Conception
South Norwalk, CT

Guidepost Montessori
Renovation
Conception
Darien, CT 06820

Hindley Elementary School - Darien Board of Education
Addition, Demolition, Renovation, Infrastructure
Design
$3,134,643 CJ est. value
Darien, CT 06820

Brunswick's Early Childhood Education Center
Renovation
Design
$20,000,000 CJ est. value
Greenwich, CT 06830

RFP - Commissioning Agent Services for New Westhill High School
Term Contract
Bidding
Stamford, CT 06902

AHU Replacement at Stamford High School
Renovation
Bidding
$400,000 CJ est. value
Stamford, CT 06902

Norwalk High School State Project
Demolition, New Construction, Infrastructure
Sub-Bidding
$120,000 CJ est. value
Norwalk, CT 06851

Boys` Locker Room Renovation at Brookfield High School
Renovation - 7,500 SF
Post-Bid
$100,000 est. value
Brookfield, CT 06804

Pre Fab Metal Building at Stamford High School
New Construction, Infrastructure - 2,460 SF
Post-Bid
$2,000,000 CJ est. value
Stamford, CT 06902

Cranbury Elementary School State Project
New Construction
Results
$35,700,000 est. value
Norwalk, CT 06851

Services for Abatement at Madison Middle School
Term Contract, Infrastructure
Results
$44,880 CJ est. value
Trumbull, CT 06611

Bullard-Havens Technical High School
New Construction, Infrastructure - 214,508 SF
Construction
$95,580,000 CJ est. value
Bridgeport, CT 06610

Norwalk High School
New Construction, Infrastructure
Pending Verification
$225,000,000 CJ est. value
Norwalk, CT 06851

New Central Middle School - Greenwich Public Schools
New Construction, Infrastructure
Pending Verification
$85,500,000 CJ est. value
Greenwich, CT 06830

Interior - Other Minor Renovations - Central Middle School
Renovation
Conception
Greenwich, CT 06830

Last Updated 01/04/2024 01:44 PM
Project Title

Waste Hauling

Physical Address View project details and contacts
City, State (County) Newtown, CT 06470   (Fairfield County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Newtown Public Schools is soliciting proposals for refuse removal and recycling services for its school buildings. This request for proposal (RFP) shall be for a three-year term, beginning July 1, 2022. The Town of Newtown is a member of the Housatonic Resources Recovery Authority (HRRA) and as such all prospective bidders shall be a registered member of the HRRA. The selected bidder shall be in compliance with HRRA regulations for the proper disposal of solid waste and recycling. Any questions should be directed to Bob Gerbert, Director of Facilities, by email to: GerbertR@newtown.k12.ct.us All pricing submitted in a bid package shall be valid for ninety (90) days. There shall be no collusion with other prospective bidders and a bid submission will be construed as evidence that the submitted bid price was derived independently without collusion with other bidders. Following the bid opening, the Newtown Board of Education will review all received bid packages. The selected bidder will receive a Purchase Order from the Newtown Board of Education to proceed with the specified services. The Newtown Board of Education reserves the right to reject any or all proposals if it deems such to be in the best interest of the Newtown Board of Education.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents