Similar Projects
Relief Wells at Wood River Levee District - USACE St. Louis
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Wood River, IL 62095

Raw Water Well
New Construction, Infrastructure
Bidding
$209,000 est. value
Eddyville, IL

Hatchery Well Pump and Motor Replacement
Infrastructure
Bidding
Marseilles, IL 61341

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Northwest Waterworks Booster Pump VFD Installation and South Operations Center Pump VFD Replacement
Results
Naperville, IL 60540

Improvements to City Well Number 31
Results
Naperville, IL 60540

Well Sealing Villa Santa Maria Convent
Infrastructure
Bidding
Less than $25,000 est. value
Oak Forest, IL 60452

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

Last Updated 11/15/2021 03:43 AM
Project Title

Thickened Sludge Pump Replacement - Building 390 Clavey Road WRF

Physical Address View project details and contacts
City, State (County) Highland Park, IL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of removing the existing Netzsch pump, forming up new concrete base, modifying existing piping to fit proposed pump, and installing new Börger PL300 rotary lobe pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents