Similar Projects
Highpoint
New Construction - 588,000 SF
Conception
Stuart, FL 34997

Catty Shack
New Construction, Addition
Conception
$8,000,000 est. value
Jacksonville, FL

Drivers Club Miami
New Construction - 209,100 SF
Design
$100,000,000 est. value
Miami Gardens, FL

Oviedo on the Park - Lot 4 - Sitework
New Construction
Design
Oviedo, FL 32765

Mechanical Site Prep of Approximately 135 Acres
Bidding
FL

Honey Hill Drive Off-Site Improvements Project
Bidding
$165,000 est. value
Miramar, FL 33027

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

KHS Site Improvements - (Sanitary Line)
Post-Bid
Keystone Heights, FL 32656

Job Order Contracting Services for Civil Site Work
Results
Tampa, FL 33602

Unsolicited Proposal for the Development, Operation and Maintenance of a Soccer Complex and Other Facilities
Results
Miramar, FL

Morgan's Cove Assisted Living - Site Work
Construction
$35,000,000 est. value
Saint Augustine, FL

Harlem Heights - Site Development
New Construction
Construction
Fort Myers, FL

11134 New Kings Road RV Park
New Construction
Pending Verification
Jacksonville, FL 32219

Pace Commons
New Construction
Pending Verification
Pace, FL

Loretto Road Subdivision
New Construction
Conception
Jacksonville, FL

Reported 12/11/2020 12:00 AM
Project Title

Phase 1 Civil Site Work Edgewater East Community Development District

Physical Address View project details and contacts
City, State (County) FL   (Osceola County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes Phase 1 Civil Site Work for the District, including but not limited to, earthwork, grading, stormwater, water/sewer/reclaim, roadways, etc., including constructing an approximately 1.14 mile section of Cross Prairie Parkway and realigning 0.38 miles of Clay Whaley Road between the Florida Turnpike and the proposed Cross Prairie Parkway. The Project will also include construction of utility trunk lines and connection of the same to mains within Old Canoe Creek Road to include crossings under the Florida Turnpike.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents