Similar Projects
Four Season Storage Facility
New Construction
Conception
Shorewood, IL 60404

Elion Logistics Park Expansion
New Construction - 6,098,100 SF
Conception
$10,000,000 CJ est. value
Wilmington, IL

McMaster Carr Warehouse Expansion
Addition
Design
Elmhurst, IL 60126

Construct Warehouse Addition for Covid-19 Response
Addition - 4,800 SF
Design
$500,000 to $1,000,000 est. value
Marion, IL 62959

Salt Storage, Generator and Sewer Connection Phase 2 (General)
New Construction
Bidding
Less than $500,000 est. value
Carrollton, Hamel, Jerseyville, IL

Salt Storage, Generator and Sewer Connection Phase 2 (General)
New Construction
Bidding
Less than $500,000 est. value
Carrollton, Hamel, Jerseyville, IL

Saberts Chicago
Renovation, Addition - 19,000 SF
Post-Bid
Chicago, IL 60644

Shabbona Lake State Recreational Area - Storage Building
New Construction - 4,320 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Shabbona, IL 60550

Timber Salt Storage Building
Results
Less than $255,474 est. value
De Kalb, IL 60115

2020 Salt Shed
Results
Rantoul, IL 61866

Industrial Building
New Construction - 175,414 SF
Construction
$10,000,000 CJ est. value
Elmhurst, IL 60126

Autobarn Subaru Expansion
Addition - 4,923 SF
Construction
Countryside, IL 60525

ShipBob Fulfillment Centers Master Plan
New Construction
Pending Verification
Chicago, IL 60607

Retail & Warehouse
New Construction
Pending Verification
Chicago Ridge, IL 60415

Amazon Warehouse
Renovation - 215,000 SF
Conception
Arlington Heights, IL 60004

Last Updated 01/29/2021 11:28 AM
Project Title

Greenway Storage and Rentals

Physical Address View project details and contacts
City, State (County) Ringwood, IL 60072   (McHenry County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Qualified Bidding.
Project Status Bidding by Invitation
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This is the first phase of work to create additional self-storage buildings on existing site This work is for the site prep of the work. Additional phases will be forthcoming Please let me know your intentions to bid this project or not

Details

Warehouse/Storage, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents