Similar Projects
Financing, Development and Construction of a Baseball Stadium
New Construction, Infrastructure
Post-Bid
$1,150,000 CJ est. value
Huntington, WV 25701

Coliseum Club Mountaineer
Renovation
Post-Bid
$3,100,000 CJ est. value
Morgantown, WV 26505

RFP Design - Replacement Turf Regarding Football and Baseball Fields
Renovation
Bidding
$751,000 CJ est. value
Granville, WV 26534

Morgantown Ice Arena Renovations
Renovation
Post-Bid
$2,000,000 CJ est. value
Morgantown, WV 26501

Splash Pads
Infrastructure
Results
$1,375,850 CJ est. value
Wheeling, WV 26003

A New Liberty High School Football Stadium Press Box
New Construction, Infrastructure
Post-Bid
$560,000 CJ est. value
Glen Daniel, WV 25932

Last Updated 04/27/2023 06:33 PM
Project Title

RFP Design - Architectural and Engineering Design Services for Coliseum Enhancements

Physical Address View project details and contacts
City, State (County) Morgantown, WV 26505   (Monongalia County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 27, 2023, information regarding an award for this solicitation is not available. At this time, it is not known if an award has been made. Closed solicitation has been included below for reference. ……………….. *The closed solicitation has been included below for reference: The proposal process is highly controlled. To protect the integrity of the process, any questions or clarifications regarding this Request for Proposal must be handled through the Department of Procurement, Contracting, & Payment Services. The intended project schedule includes the following milestones: Contractor Award August 15, 2021, Substantial Completion January 30, 2022 WVU Athletics wishes to partner with an AE firm to provide design services to repurpose the existing strength and conditioning space on the event level of the Coliseum as a multi-use space to serve as a Club space for the premium seat holders. The space will be vacated once the Athletic Performance Center (APC) is complete, the APC is expected to be complete Fall 2021. The University reserves the right to modify the solicitation. If it is amended, then all terms and conditions which are not modified remain unchanged. The method of contractor selection has not been determined at this time. Question Submission Close Date 1/26/2021 12:00 PM EST *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents