Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Lookout Point Powerhouse Heat Pump Ventilation
Alteration
Design
$250,000 to $500,000 est. value
Lowell, OR 97452

Commercial Grade Air Conditioning System
Renovation
Sub-Bidding
$400,000 CJ est. value
Ashland, OR 97520

Vale Elementary School HVAC Upgrade - Phase II
Renovation
Sub-Bidding
$500,000 CJ est. value
Vale, OR 97918

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

Industrial Chiller Maintenance
Alteration
Post-Bid
Eugene, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

Classroom Climate / High Lakes Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$20,189 CJ est. value
Bend, OR 97701

Classroom Climate/WE Miller Elementary- 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$367,666 CJ est. value
Bend, OR 97703

WWTP Shop Building HVAC Upgrade
Renovation
Sub-Bidding
$400,000 CJ est. value
Lincoln City, OR 97367

HVAC Design-Build Services at Multiple Schools
Alteration
Post-Bid
Coos Bay, OR

On Demand HVAC Repair Services
Alteration
Results
OR

Classroom Climate / Kenwood Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$197,862 CJ est. value
Bend, OR 97701

2023 City Hall (Council) HVAC Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Eagle Point, OR 97524

Last Updated 03/13/2023 05:09 PM
Project Title

Indoor Air Quality

Physical Address View project details and contacts
City, State (County) Estacada, OR 97023   (Clackamas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 13, 2023, project is cancelled. Project is no longer needed.** The Estacada School District is soliciting proposals to establish a contract through fair and competitive negotiations for installing mini-split units in designated classrooms. The Estacada School District will be installing mini-split units in designated classrooms in the District. This is part of a district-wide initiative to improve the indoor air quality in the classrooms. The District reserves the right to (1) reject any RFP response not in compliance with applicable laws, (2) to add to the price of nonresident respondent an increase equal to the percent preference that the nonresident respondents home state would give its in-state respondents and (3) to reject for good cause any or all offers that the District determines, at its sole discretion, are not in its best interest.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents