Similar Projects
Stair Replacement, Barre Falls Dam, Barre, MA
Term Contract
Design
Barre, MA 01005

Worcester Side Platform and Waterproofing
Alteration
Bidding
$3,200,000 est. value
Worcester, MA

Phase 2 Sliding Door Replacement and Balcony Repairs
Alteration
Bidding
$111,000 est. value
Gardner, MA 01440

Replace Grid Ceiling and Lighting In Four Hallways of Haley Academic Building
Post-Bid
Less than $135,000 est. value
Gardner, MA 01440

Interior Alterations for COVID-19 Protocol Public Service Window
Post-Bid
Less than $35,000 est. value
Athol, MA 01331

Gutter Replacement Phase 2
Results
Less than $16,000 est. value
South Lancaster, MA

Unit Renovations Phase 3
Results
Less than $25,000 est. value
Gardner, MA 01440

Kitchen Cabinet Replacement
Alteration
Bidding
$49,000 est. value
Southborough, MA 01772

Facade Improvements to Single-Story Commercial Building
Post-Bid
Clinton, MA 01510

Repair Cupola
Results
Less than $25,000 est. value
Sutton, MA 01590

Repairs to First Floor Ceilings
Alteration
Bidding
$50,000 est. value
Douglas, MA 01516

Accessible Transaction Counters with Cough - Protection Screens
Post-Bid
$55,000 est. value
Templeton, MA

Senior Center Outdoor Space Construction
Results
$45,000 est. value
Hubbardston, MA 01452

Doherty Memorial High School - Underground Waterproofing - Sub-Bids
Alteration
Post-Bid
$480,000 est. value
Worcester, MA 01602

Gutters and Downspouts Crocker Field House
Results
Fitchburg, MA

Reported 03/03/2022 12:00 AM
Project Title

4th Floor Entrance

Physical Address View project details and contacts
City, State (County) Fitchburg, MA 01420   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $21,296
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Waiting Area at the 4th Floor Entrance is to be converted to an office space of about 160 sf. Work includes, but not limited to, the removal of 12 lin ft exterior glazing, 2 ceiling mounted electric heating panels, and 2 wall mounted lighting fixtures. New work includes, but not limited to, "infill" exterior wall, installation of 2 exterior windows, an interior partition wall, a drop box, an interior window, a ³pass through´window unit, 2 ceiling mounted light fixtures, 2 electric outlets, a ³mini´heat pump, and the painting of the ceiling and walls.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents