Similar Projects
Alleghany Road Distribution Center
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Corfu, NY 14036

Excelsior Energy Center
New Construction, Infrastructure
Design
$345,550,000 CJ est. value
Batavia, NY 14020

Alleghany Road Multi-Residential Development
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Corfu, NY 14036

Jackson Street Water System Improvement Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Batavia, NY 14020

Roadway Improvements to NYS Route 63
Infrastructure
Bidding
$5,000,000 CJ est. value
Batavia, NY 14020

Provide Forensic Identification Unit and Additions - Electrical Work
Addition, Demolition, Infrastructure
Post-Bid
$9,000,000 CJ est. value
Batavia, NY 14020

Town of Alexander Water District No. 6
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Alexander, NY 14005

2020 Capital Improvement Project Contract 105: Site Work
Infrastructure
Results
$1,857,000 est. value
Alexander, NY

Culvert Rehabilitations, Drainage Repairs and Miscellaneous Work
Infrastructure
Results
$2,167,958 CJ est. value
Batavia, NY 14020

Plug Power
New Construction, Infrastructure
Construction
$290,000,000 CJ est. value
Alabama, NY 14013

Ivy Village Senior Apartments
New Construction, Infrastructure - 105,935 SF
Pending Verification
$22,000,000 CJ est. value
Le Roy, NY 14482

Cider Solar Farm
New Construction, Infrastructure
Pending Verification
$550,000,000 CJ est. value
Elba, NY 14058

Main Road Solar
Infrastructure
Design
$11,000,000 CJ est. value
Le Roy, NY 14482

Rehabilitation of Oak Orchard Road Bridge Over Oak Orchard Creek
Infrastructure
Bidding
$2,000,000 CJ est. value
Batavia, NY 14020

Water District No. 12
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Stafford, NY 14143

Last Updated 07/24/2023 09:33 PM
Project Title

Walker Road 1.63 Million Gallon Water Storage Tank

Physical Address View project details and contacts
City, State (County) Pavilion, NY 14525   (Genesee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install a 1.63 million gallon precast, pre-stressed concrete water storage tank and related site appurtenances in the Town of Pavilion The Work will be substantially complete on or before September 15, 2024, and completed and ready for final payment in accordance with Article 15.06 of the General Conditions on or before December 31, 2024. goal is a combined participation by MBE and WBE firms on a minimum of twelve percent (12%) of the total Contract Price. Further, neither the MBE nor WBE participation should be less than six percent (6%) of the total Contract Price

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents