Similar Projects
New Flooring
Post-Bid
Huntington, UT

Gale Center Flooring Replacement
Post-Bid
South Jordan, UT 84095

Rubber Tile Flooring - Rubber Tile Flooring
Term Contract
Results
UT

Bonneville High School Floor and Wall Tile Project
Term Contract
Results
Ogden, UT

Gym Floor Refinish and Repaint
Post-Bid
Castle Dale, Ferron, Green River, Huntington, UT 84525

Wash Bay Platform Fabrication
Results
South Jordan, UT 84095

Jordan High School Floor Covering Replacement
Post-Bid
Sandy, UT 84070

Installation of New Carpet and Tile and for Surface Preparation and Application of New Paint Throughout the Delta City Complex
Results
Delta, UT

Replacement and Installation of Carpet
Post-Bid
Price, UT

Flooring Services for Spence and Cleone Eccles Football Center
Results
Salt Lake City, UT 84108

Specialty Flooring for Rice-Eccles Stadium
Term Contract
Post-Bid
Salt Lake City, UT 84112

Alumni House Stair and Floor Replacement
Results
Less than $300,000 est. value
Salt Lake City, UT 84112

President’s Residence Flooring
Post-Bid
Ephraim, UT 84627

DFCM Construction-Standard Low Bid-Uintah Tech Flooring Replacement
Results
$400,000 est. value
Roosevelt, UT 84066

Portable Basketball Floor for Uccu Center
Post-Bid
Orem, UT

Reported 08/06/2019 12:00 AM
Project Title

Tile Floor Installation

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description We need to replace the tile floors in 2 shower stalls at our facility. Room# 347 and 329 in the Pediatric Building. The existing tile will need to be removed as well as the bottom row of tile on the shower walls. A new pan will need to be added and the floor will need to be graded to slope to the drain. The walk-in door entrance to the shower will need to have a tiled lip across the entrance to retain excess water. The tiled lip will need to be coolored different than the rest of the tile to draw attention to it as to prevent users from tripping on it.
Details
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents