Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Construction Services for Poitras East Community Development District
Post-Bid
FL

Stormwater Drainage Expertise Lakewood Ranch Inter-District Authority Community Development District 5
Post-Bid
Lakewood Ranch, FL 34202

Storm Sewer Rehabilitation by Cured-In-Place Pipe (CIPP) Technology
Results
Less than $304,580 est. value
Jacksonville, FL

Y--IGF::OT::IGF RV Work Camp Sewer Connection
Results
Less than $25,000 est. value
Big Pine Key, FL

Stormwater Improvements
Construction
Lake City, FL 32055

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Plugged Storm Drains
Results
Everglades, FL

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

East College, East Jefferson & South Meridian Streets Water and Sewer Improvements
Results
Less than $2,739,200 est. value
Tallahassee, FL

South Campus Stormwater Management - DRA #4 Project
Post-Bid
Pembroke Pines, FL 33024

Stormwater Management System Prevent Maintenance
Term Contract
Results
Sunny Isles, FL 33160

Abandonment of Existing Septic System
Post-Bid
Orlando, FL 32805

Pre-Cast Storm Water Control Stuctures
Results
Kissimmee, FL 34741

Blue Lake Elementary - Stormwater Drainage Upgrade
Post-Bid
De Land, FL 32724

Last Updated 03/11/2020 11:14 AM
Project Title

Stormwater Maintenance and Repair

Physical Address View project details and contacts
City, State (County) Fort Myers Beach, FL   (Lee County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all materials, tools, supplies, heavy equipment, vehicles and labor necessary for the maintenance, repair and televising and video recording of all stormwater drains. The Proposer shall furnish all materials, tools, supplies, heavy equipment, vehicles and labor necessary for the maintenance, repair and televising and video recording of all stormwater drains. The Proposer shall bear all costs associated with the Project. Stormwater cleaning shall be performed with hydraulically propelled or mechanically operated cleaning equipment. Selection of equipment shall be based on field conditions, taking into account all relevant factors such as, by example and not limitation, type and quantity of debris to be removed, size of pipe, depth of flow and the like. Television inspection and video recording of all sewer and storm drains shall be required for the documentation of various field conditions and activities as directed by the TOWN’s representative. Stormwater pipe joint sealing shall be accomplished by the injection of chemical sealing materials into and/or through the joints from within the pipe.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents